28
1.7 Operation Test
Connect the UPS to the wall receptacle.
Push on the Main Switch to check the Green Line (
) LED is on.
Connect your computer equipment with sockets of the UPS and pull off the
input power cable of the UPS from the wall receptacle to check if the Line (
) LED is flashing every 3 seconds. Meanwhile, please check if alarm
buzzer is beeping.
Try the field working condition by running some application programs on your
computer and repeating step.
Check if the UPS is initiated properly to support continuous operation.
Plug the UPS into the wall outlet to charge the UPS for over 10
hours before using the UPS.
1.8 Front Panel Explanations
On the front panel You can found 2 LED for an easy diagnostic.
LED
Information
Main Switch
To Control on/off the UPS when Utility is normal.
To enable “DC-Start” Function when Utility fails. (To
enable DC Start properly, you are recommended to
connect <80% output load with the UPS only). P.S.
Make sure the computer connected to the UPS is
switched on before enable the "DC-Start" function. You
are not recommended to add some other computer or
Summary of Contents for onepower 701
Page 1: ......
Page 17: ...17 Le batterie sostituite vanno considerate come un RIFIUTO TOSSICO e trattate di conseguenza...
Page 27: ...27...
Page 31: ...31 Once the battery is disconnected the loads are not protected from power outages...
Page 53: ...Atlantis SpA Via S Antonio 8 10 20020 Lainate MI info atlantis land com...