1.

 

PROTECT SHOWER FLOOR 

This shower has been supplied with a 
polystyrene protective cover.  Ensure the 
shower base remains protected during glass 
installation. 
 

2.

 

CHOOSE DOOR DIRECTION

 

 

 
 
 
 
 
 

 
 

3.

 

WALL CHANNEL INSTALLATION

 

Two glass receiver channels have been supplied.  
The shorter channel measuring 1964mm is to be 
installed on the fixed panel side. The longer wall 
channel measuring 2013 is to be installed on the 
return panel side.

 

 

4.

 

Position the glass receiver channel on the base 
glazing channels. Use a 
straight edge and 
mark the wall to 
indicate where the 
wall channel is plumb.  

 

 

 

 

 

5.

 

Apply a silicon bead to the full length of 
channels. Silicon used must be compatible with 
anodised aluminium, as well as acrylic or the 
waterproofing being used. 

 

6.

 

Ensure the glass receiver sits firmly on the base 
glazing channel. Locate the framing timber. Use 
the 4mm drill bit to drill holes through the glass 
receiver channels. Fix four screws through the 
channels into the wall framing (use wall plugs if 
required supplied with 
wall channels).  

 

 

 

 

 

7.

 

Apply a continuous bead of silicon to the full 
length of the channels and waterproofing, 
indicated by the dark line (inside channel).  
 

 
 
 
 
 
 
 
 

8.

 

GLASS PACKER PLACEMENT

 

Apply 2x clear packers 
(

BAG 11

) into the 

base glazing channels 
in locations as shown.  
 
 
 
 
 
 

Summary of Contents for miGLIDE MG2-SMALL

Page 1: ...asure 1x Bag11 Packers Phillips Screwdriver 1x Blue Masking Tape 1x BAG GB G sliding door guide blocks 1 x Clear Silicon 1 x BAG MG SCREWS 8x6 x10CSK screws 2x6 x40CSK screws 2 5mm drill bit 2 x Clear...

Page 2: ...efect must be visible to the naked eye in normal daylight conditions standing at a distance of two meters Any imperfection that is not visible within the above noted parameters will not be accepted by...

Page 3: ...hannels Use a straight edge and mark the wall to indicate where the wall channel is plumb 5 Apply a silicon bead to the full length of channels Silicon used must be compatible with anodised aluminium...

Page 4: ...wall channel 11 INSTALLATION OF THE RETURN PANEL Locate the glass panel 20 B into the glazing channel Adjust height of panel if necessary by adding or removing plastic packers bag11 in the base glazi...

Page 5: ...4x 6 x10CSK screws Fixed Panel this end 17 END CONNECTOR ANGLE MG 2W Fix the MG 2W end connector angle into place Screws should be left slightly loose 18 TOP TRACK AND DOOR PLACEMENT Stand inside the...

Page 6: ...the door as far back in an open position as possible Slip the sliding guide block under the door and locate it in line with the end of the fixed panel on the opening side Apply a small bead of silicon...

Page 7: ...d colour finish Install into the recess into the top track Sand the reverse face of the acrylic to allow for adhesion Apply 2 x 3mm beads of silicone to front face of top track Place the detail strip...

Page 8: ...1909 Revision By JST ACRYLIC LINER Z FLASHING When a 2mm Acrylic Wall liner has been supplied the aluminium Z Flashing will need to be trimmed Using a hacksaw trim the inside angle of the Z flashing a...

Page 9: ...nstalled on base prior to tiling Black Pearl Installed onto acrylic base when installing screens CODE ABS LQ GB SHORT Linea Quattro Installed after tiling or on an Architectural Finish when installing...

Reviews: