First seal test
- Remove the protective plugs (
%
) from the charging
hole (
Schrader
) in the "Gas" valve (large diameter).
- Connect the high pressure hose to the
Manifold
.
- Connect the bottle of nitrogen to the
Manifold
(Use
only dry nitrogen type U)
- Pressurize the refrigerant circuit with nitrogen (10 bar
maximum) ("Gas" connection – condensor - "Liquid"
connection assembly).
- Let the circuit under pressure for 30 minutes.
Lo
Hi
UE
MH
Liaison...
liquide
gaz
Haute
pression
Azote
10 bars max.
30 mn mini
High
pressure
Nitrogen
Max. 10 bar
during 30 mn mini.
Connection
Liquid
Gas
- Search for leaks with a leak detector product, repair
and repeat the test.
Lo
Hi
UE
MH
Liaison...
liquide
gaz
Haute
pression
Contrôle
d’étanchéité
Vanne fermée,
Contrôle pression
High
pressure
Closed valve,
pressure control
Leak control
- When the pressure is stable and leakage is excluded,
drain nitrogen letting a pressure above atmospheric
pressure (0,2 to 0,4 bar).
&UHDWLQJ D YDFXXP DQG ¿OOLQJ WKH UHIULJHUDWLRQ
connections with gas
- If necessary, calibrate the
Manifold
gauge to 0 bar.
Adjust the vacuum gauge to the atmospheric pressure
(around 1013 mbar)
- Connect the vacuum pump to the
Manifold
. Connect
a vacuum gauge if the vacuum pump is not equipped.
Lo
Hi
UE
MH
Liaison...
liquide
gaz
Haute
pression
Vacuomètre
Pompe à vide
High
pressure
Vacuum pump
Connection
Liquid
Gas
Vacuum gauge
- Create a vacuum until the residual pressure* in the
circuit falls below the value given in the following table.
(* measured with the vacuum gauge)
7&
&7&
&7&
&7
3PD[
EDU
. .
PEDU
. . . 0.009 . . .
. . . . . 9 . . . . .
. . . 0.015 . . .
. . . . 15 . . . .
. . . 0.020 . . .
. . . .20 . . . . .
¿JXUH
Connexion of the hose on the "Gaz" valve
- Let the pump continue to operate for another
30 minutes minimum after reaching the vacuum.
- Close the
Manifold
valve and then stop the vacuum
pump
ZLWKRXW GLVFRQQHFWLQJ DQ\ RI WKH KRVHV LQ
place
.
"
,I WKH RXWGRRU WHPSHUDWXUH LV EHWZHHQ DQG
&XVHPHWKRGHPSW\VHH$11(;
- Remove the access plugs (
A
) from the valve controls.
- If an additional charge is requires, add the additional
FKDUJH EHIRUH ¿OOLQJ WKH K\GUDXOLF XQLW ZLWK JDV
Please refer to the
para.
"Additional charge
(outdoor three phase unit)", page 30
.
- First of all fully open the "Liquid" valve (small)
and then the "Gaz" valve (large) using a hex key
(counterclockwise direction) without forcing
excessively against the stop.
- Remove the hose rapidly to the
Manifold
.
-
5H¿WWKHRULJLQDOFDSVEHVXUHWKH\DUHFOHDQDQG
tighten them to the recommended tightening torque.
The sealing is performed in the caps only metal to metal.
The outdoor unit does not contain any additional
refrigerant, enabling the installation to be purged.
Flushing is strictly forbidden.
2.10.2 Sealing test
Once the refrigeration circuit has been gassed as
described above, check that all the refrigeration
connectors are gas-tigh (4 connectors).
The sealing test must be performed with an approved
JDVGHWHFWRU,IWKHÀDULQJVKDYHEHHQPDGHFRUUHFWO\
there should be no leaks.
"
If there is a leak:
- Bring the gas into the outdoor unit (pump down).
- Make the connection again.
- Repeat the commissioning procedure.
Refrigeration connexion
Plug (A)
Hex / Allen key of 4 mm
3-way valve
Load orifice
Plug (B)
Service hose (blue)
fitted with valve push-button
High pressure hose (red)
Refrigeration connecxion (Gas)
Installation and commissioning instructions "1485 - EN"
- 29 -
Heat pump alféa hybrid duo gas