ATI Technologies Q45H/62 Manual Download Page 8

Analytical Technology Unit 1 & 2 Gatehead business PK, OL3 5DE 
Phone +44 145 783 2800 
Fax +44 145 783 9500 
[email protected]

 

 

Q45H Training Handout 4.05 

Page 7 of 11

 

allow for stabilization of the pH probe.  An independent pH meter, lab test or colorimeter is required to get this 
reading for the 1 point cal, if you do not have a portable pH monitor or a method of measuring pH, you will need to 
continue using the 2 point cal with buffers for future calibration. If you feel that the application you are using has a 
different pH to that of the water you are measuring, complete the 1 point cal and leave. 

 

Maintenance of the pH probe (replacing the saltbridge and refill solution) 

If FAIL appears when calibrating the pH probe, give the bulb a wipe with white vinegar and see if it will pass. If it 
remains to fail and the pH sensor is 2 years old or more, it may require maintenance in the form of a replacement 
saltbridge and refill solution. These are low cost consumables. Simply clean the bulb with white vinegar, unscrew 
the old saltbridge (brown plastic piece around the bulb), turn the probe up so that the bulb is facing up, pipette the 
refill into the horseshoe gap until filled. Fill with a bit more to make sure that there are no air bubbles in the sensor. 
Now screw on the new salt bridge and screw in fully and tight. Connect back onto the cable and calibrate. 
 

Do not zero the monitor unless you are expecting zero chlorine 

There is absolutely no need to zero the sensor. Once you leave to polorize it will (in most cases) come to the  correct 
reading of chlorine if left. The zero does not move. If you zero in error (calibrating by using 2…zero instead of 
1…span) You WILL need to zero. Do this by disconnecting the sensor from the cable. The reading will come to 
0.000. Go into MEASURE and look at nA reading. This should also get to 0nA. Once it has, go to CAL menu and 
zero by changing the number to 2…zero. Press ENTER and it will zero. If you are using the free chlorine monitor as 
a ‘break through’ monitor when using ammonia or sulphite, etc. You can zero the monitor by completing the above 
if you are certain that there is no chlorine at all. 
 

I am losing electrolyte? Why? 

If the sensor has been built and tightened correctly with the o rings in place, there should not be any loss in 
electrolyte. Please rebuild and check that the o rings are in place and are not broken. If after time this happens again, 
it may be due to ‘micro cavitation’ created by the pump you are using, drawing the electrolyte out of the membrane 
(vacuum created). This may happen in < 1% of all chlorine applications. If this does happen, ATi make an 
electrolyte gel that can be used. It is best not used if helped due to the decrease in sensitivity after calibration.  

 

How often should I check and/or calibrate the chlorine monitor? 

You can check the calibration as often as you would like. The difference between ‘check’ and ‘calibration’ is simply 
pressing a few buttons. Simply perform a dpd test and compare with the reading of the ATi chlorine monitor. If it is 
> +/- 0.1ppm, calibrate. If it is /- 0.1ppm, leave. Remember to check the pH with standards OR with a 
portable pH monitor before you check the chlorine if the compensation is turned on. Calibration can be anywhere 
between every 1 month, 2 months (up to 18 months) in some cases! Please make sure you are 100% confident with 
the method of checking before you calibrate because the ATi monitor will only be as accurate as this method.  

 

How often do I change the membrane? When do I know when this will be? 

You should only change the membrane when you attempt to calibrate and it fails with messages; ‘slope too high’ or 
‘slope too low’. This means that you are trying to change the reading (and of course the sensitivity of the membrane) 
at a stage where the unit cannot compensate for the change. This could be <20% or >600% slope. Best to check the 
slope% (in MEASURE) prior to making the change as this would prove to be helpful when estimating when the 
membrane should be changed. The slope can be anywhere between 20% and 600%. It will only change when you 
calibrate the unit. If you change the reading UP, the slope will come DOWN and vica versa. Once you get close to 
the  low or high slope and need to change it so it increases/decreases further, it can fail.  
 

My pH is very high and varies a lot. It is making my chlorine unstable due to dissociation of HOCL 
with the pH? 

Contact ATi to assist with the settings of the curve within the electronics. The old 3 point compensation has now 
been changed for the user to alter the curve to accept higher pH readings. This will assist in the overall reduction in 
error due to the high pH. 
 

I don’t believe that my portable can be +/- 0.1ppm! Show me proof from the manufacturer! My Hach 
says +/- 0.02ppm! Why shouldn’t this be the case! Please see fig below for Palin test explanation.

 

 

Summary of Contents for Q45H/62

Page 1: ...ee Chlorine Measurement System Training Handout European Office Analytical Technology Unit 1 2 Gatehead Business Park Delph New Road Delph Saddleworth OL3 5DE Tel 01457 873 318 Fax 01457 874 468 Email...

Page 2: ...the escape key aborts all changes to the current screen and backs the user out one level in the software tree The manual will refer to this key as either MENU or ESC depending upon its particular fun...

Page 3: ...ssion is all that is needed Do not use tools to tighten The membrane should be flat across the bottom of the chamber without wrinkles 5 Fill the chamber with electrolyte until the level reaches the bo...

Page 4: ...in 15 minutes 1 If the sensor requires zeroing simply go to the MEASURE mode press the UP arrow until it reads zero n A 2 Now disconnect the chlorine sensor and watch the readings drop to zero leave f...

Page 5: ...nd press ENTER AT THIS POINT CARRY OUT THE DPD TEST AND WAIT FOR AT LEAST 20 SECONDS PER DPD TABLET AND CARRY OUT 2 TO 3 TO GET THE CORRECT AVERAGE 4 The system now begins acquiring data for the calib...

Page 6: ...r calibration this minimum is required due to potential error of dpd test pH Calibration Must do first Keys to Press Screen Display User Action Required 1 MENU ESC until CAL MENU 2 ENTER Cal Cl2 3 Cal...

Page 7: ...CONFIGURATION and program in CONTROL menu There are 2 x 4 20mA outputs and 2 x relays can be configured for alarm control or fail Initial set up in CONFIGURATION and then program in CONTROL menu The...

Page 8: ...and check that the o rings are in place and are not broken If after time this happens again it may be due to micro cavitation created by the pump you are using drawing the electrolyte out of the memb...

Page 9: ...d The difference between the very experienced and less experienced user is that the experienced user would calibrate the colorimeter prior to calibration take 3 tests and average them out The less exp...

Page 10: ...the fill screw from the side of the sensor body 2 Remove the front nut from the bottom of the chamber and discard the protective membrane O rings are contained in grooves on both the bottom and top o...

Page 11: ...Q45H Training Handout Page 10 of 11 Q45H 62 OPERATIONAL LOG PRINT OFF AND USE Date Q45H pH Value Portable pH Value Q45H CL2 Value DPD CL2 Value Pre Cal Slope Post Cal Slope Maintenance...

Reviews: