® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
Manufacturer ATH-Heinl GmbH & CO.KG
- 30 -
4.
Pneumatic connection
a.
Install the pneumatic hose(s) as shown below.
P1 = Secondary scissors main lift
P2 = Main scissors main lift
A-2 = Secondary cylinder wheel-free lift
AV1 = Release for wheel-free lift
AV2 = Release for main lift
AV3 = Lowering acceleration valve
You will find the associated circuit diagram in Appendix 6.1 of these operating instructions.
Summary of Contents for Cross Lift 50+
Page 3: ...BEDIENUNGSANLEITUNG ATH Cross Lift 50 ...
Page 67: ...OPERATING INSTRUCTIONS ATH Cross Lift 50 ...
Page 131: ...MANUEL D UTILISATION ATH Cross Lift 50 ...
Page 195: ...NÁVOD K OBSLUZE ATH Cross Lift 50 ...
Page 259: ...MANUAL DE INSTRUCCIONES ATH Cross Lift 50 ...
Page 323: ...BEDIENINGSHANDLEIDING ATH Cross Lift 50 ...
Page 387: ...INSTRUKCJA OBŁSUGI ATH Cross Lift 50 ...