® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
Manufacturer ATH-Heinl GmbH & CO.KG
- 59 -
Visual inspection (authorised expert)
Inspection Certificate
relating to a regular / extraordinary inspection / audit *)
The device has undergone a readiness test.
No / the following *) defects were found:
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
Inspection contents: functional and visual inspection according to specifications
Pending partial inspection:
_________________________________________________________________________________
_________________________________________________________________________________
There were no *) concerns arising from commissioning, an audit is not *) required.
(Place, date)
(Technical expert signature)
Confirmation of acceptance:
(Name of technical expert)
(Title)
(Address)
(Employed at)
Operator (company stamp, date, signature)
Faults noted **) ________________________________________________________
Faults remedied **) ____________________________________________________________________
*)
Delete if not applicable
**)
Confirmation of operator or a representative with date and signature
Summary of Contents for Cross Lift 50+
Page 3: ...BEDIENUNGSANLEITUNG ATH Cross Lift 50 ...
Page 67: ...OPERATING INSTRUCTIONS ATH Cross Lift 50 ...
Page 131: ...MANUEL D UTILISATION ATH Cross Lift 50 ...
Page 195: ...NÁVOD K OBSLUZE ATH Cross Lift 50 ...
Page 259: ...MANUAL DE INSTRUCCIONES ATH Cross Lift 50 ...
Page 323: ...BEDIENINGSHANDLEIDING ATH Cross Lift 50 ...
Page 387: ...INSTRUKCJA OBŁSUGI ATH Cross Lift 50 ...