![ATEN CL1308 User Manual Download Page 76](http://html1.mh-extra.com/html/aten/cl1308/cl1308_user-manual_2997607076.webp)
CL1308 / CL1316 User Manual
66
2. Attach the left and right
easy-installation
mounting rails to the inside of
the rack. The flange that supports the switch will be to the inside.
a) Screw the front flanges to the rack first.
b) Slide the bars with the rear flanges toward the rack until the flanges
make contact with the rack, then screw the rear flanges to the rack.
(Continues on next page.)
Front Flang
Slide bar
Rear Flang
Rear Attachment
Support Flang
Sliding Bracket
Left Rail
Right Rail
Summary of Contents for CL1308
Page 1: ...LCD KVM Switch CL1308 CL1316 User Manual www aten com...
Page 18: ...CL1308 CL1316 User Manual 8 This Page Intentionally Left Blank...
Page 26: ...CL1308 CL1316 User Manual 16 Two Level Installation Diagram CL1316 CS1316...
Page 80: ...CL1308 CL1316 User Manual 70 This Page Intentionally Left Blank...