background image

AWMS-2-D13-C | Page 12 of 13

AWM-AD Page 3 of 4

5. 

Adjust tilt tension & install security screw

5.1

 Use the allen key to adjust the tilt tension until the monitor 

holds in a vertical position at the end of the arm.

Note:

 Support 

monitor while 

adjusting.

Tighten

Loosen

Tighten

Loosen

5.2 OPTIONAL security screw

Tilt the head upwards to install the optional security screw.

7. 

Tension gauge

7.1

 When installing 

multiple monitors 
of a similar weight, 
use the tension 
gauge to make 
installation faster.

1. 

Set up one monitor and 
record the position of the  
marker on the gauge.

2. 

When installing subsequent 
monitors, pre-tension the 
arm to the recorded amount, 

then fine-tune the tension by 

following steps 

6.3

 to 

6.5

.

Arm Tension Gauge

Marker

Heavier

Monitor

Lighter

Monitor

6. 

Adjust arm tension

6.1

 To accurately set the tension of the arm, position 

the monitor at 90 degrees

6.2

 Use the allen key to adjust the arm tension to the weight of the 

monitor. Follow steps 

6.3

 to 

6.5

 to set the tension.

6.3

 If the monitor sags or falls down, 

increase the arm tension by rotating 

the screw clockwise.

6.5

 If the monitor floats or hovers in all 

positions the arm tension is balanced 

and does not require further adjustment.

6.4

 If the monitor springs upwards from the 

bottom position, decrease the arm tension 

by rotating the screw anti-clockwise.

Monitor Falls

(from top)

Increase Tension

Monitor ‘Floats’

(all positions)

  

Balanced

Monitor Springs

(from bottom)

Reduce Tension

90°

Summary of Contents for AWMS-2-D13-C

Page 1: ...AWM LC Post Clamp x1 C AWM P13 135 Post x1 C Clamp Page 2 Page 3 135 Post Page 6 Page 7 Post Clamp Page 8 Page 9 Dynamic Arm Page 10 Page 11 Page 12 Page 13 AWM FC Component Checklist Clamp Installati...

Page 2: ...tallation instructions This product is compatible with Atdec modular AWM products The manufacturer accepts no responsibility for incorrect installation A C Clamp Bracket x1 B C Clamp Plate x1 C Cover...

Page 3: ...th post Tighten Firmly 3 2 Place in desired location 3 3 Slide the C Clamp bracket over the plate and position screw tips in the indents on the base plate Note You may need to un screw the set screws...

Page 4: ...t up against the mounting surface edge 4 2 Locate the C Clamp cover over the post Guide over the holes in the base plate and gently apply pressure on the cover until it clicks into place 5 2 Place the...

Page 5: ...continuing product development the manufacturer reserves the right to alter specifications without notice 20180502D 6 Installing the clamp cover to base 6 1 Locate the Cover for Base over the base Gu...

Page 6: ...products The manufacturer accepts no responsibility for incorrect installation All tools provided A Post x1 C Screw M8 x2 F Cable clips not supplied with all posts B Post Cap x1 E Cable Cover x1 not...

Page 7: ...ot come with all posts Note Cable clips do not come with all posts Additional clips sold separately atdec com atdec co uk atdec com au No portion of this document or any artwork contained herein shoul...

Page 8: ...RTANT INFORMATION Please ensure this product is installed as per these installation instructions This product is compatible with AWM Series Arms Posts and Wall Channels The manufacturer accepts no res...

Page 9: ...hould always face towards the user ure Knob is undone lastic sleeve Tip push knob to aid insertion 2 Slide post clamp into channel 2 Remove rotation ring 1 Press 2 Lift 3 Hold clamp in desired positio...

Page 10: ...product is installed as per these installation instructions This product is compatible with Atdec AWM Series products The Dynamic Arm AWM AD requires a Channel Clamp AWM LC sold separately for instal...

Page 11: ...e arm will be attached to The tag on the ring should always face towards the user 180 360 OR Default Position Flipped Position Tag 1 Press 2 Lift 3 2 Attach VESA head onto monitor with provided screws...

Page 12: ...to the recorded amount then fine tune the tension by following steps 6 3 to 6 5 Arm Tension Gauge Marker Heavier Monitor Lighter Monitor 6 Adjust arm tension 6 1 To accurately set the tension of the a...

Page 13: ...riple arm set ups Note Ensure enough cable slack is given to allow for movement of the monitor Push 6 Monitor arm cable management 6 1 Plug cables into the monitor and route the cables down the arm us...

Reviews: