background image

AWMS-2-D13-C | Page 9 of 13

AWM-LC Page 2 of 2

1. 

Fix Clamp to Post or Wall Channel

3. 

Fit AWM Series arm to Post Clamp

1.1

 Ensure knob is undone.

2.1

 Remove plastic sleeve.

3.1

 Push arm onto clamp.

1.2 

Slide Post Clamp into channel.

2.2 

Remove rotation ring

3.2 

Ensure arm is fully pushed onto clamp.

Push knob to 

aid insertion

1.3 

Hold clamp in desired position on post 

and turn knob to  lock in place.

2.3 

Place rotation ring in the desired position.

3.3 

Tighten joint screw.

Note: 

Check the 

arm rotation is 
smooth after 
tightening.

Note: 

Arm sold 

separately

Note: 

Place the rotation ring 

depending on what post channel 
the arm will be attached to. The tag 
should always face towards the user.

1. Ensure Knob is undone

1. Remove plastic sleeve

Tip: push knob

to aid insertion

2. Slide post clamp into channel

2. Remove rotation ring

1. Press

2. Lift

3. Hold clamp in desired position on post and turn 

knob to lock in place

3. Place the rotation ring 

in the desired postion

atdec.com | atdec.co.uk | atdec.com.au

No portion of this document or any artwork contained herein should be reproduced in any way without 
the express written consent of Atdec Pty Ltd. Due to continuing product development, the manufacturer 
reserves the right to alter specifications without notice. ©20180518A - E02

180°

360°

OR

Default

Position

Flipped

Position

 

Tag

1. Push arm onto clamp

2. Ensure arm is fully pushed onto clamp

3. Tighten set screw

Tip: Check the 

arm rotation is 

smooth after 

tightening.

2. 

Set arm rotation to 180° (optional)

Note: default arm rotation is set to rotate 360�

Summary of Contents for AWMS-2-D13-C

Page 1: ...AWM LC Post Clamp x1 C AWM P13 135 Post x1 C Clamp Page 2 Page 3 135 Post Page 6 Page 7 Post Clamp Page 8 Page 9 Dynamic Arm Page 10 Page 11 Page 12 Page 13 AWM FC Component Checklist Clamp Installati...

Page 2: ...tallation instructions This product is compatible with Atdec modular AWM products The manufacturer accepts no responsibility for incorrect installation A C Clamp Bracket x1 B C Clamp Plate x1 C Cover...

Page 3: ...th post Tighten Firmly 3 2 Place in desired location 3 3 Slide the C Clamp bracket over the plate and position screw tips in the indents on the base plate Note You may need to un screw the set screws...

Page 4: ...t up against the mounting surface edge 4 2 Locate the C Clamp cover over the post Guide over the holes in the base plate and gently apply pressure on the cover until it clicks into place 5 2 Place the...

Page 5: ...continuing product development the manufacturer reserves the right to alter specifications without notice 20180502D 6 Installing the clamp cover to base 6 1 Locate the Cover for Base over the base Gu...

Page 6: ...products The manufacturer accepts no responsibility for incorrect installation All tools provided A Post x1 C Screw M8 x2 F Cable clips not supplied with all posts B Post Cap x1 E Cable Cover x1 not...

Page 7: ...ot come with all posts Note Cable clips do not come with all posts Additional clips sold separately atdec com atdec co uk atdec com au No portion of this document or any artwork contained herein shoul...

Page 8: ...RTANT INFORMATION Please ensure this product is installed as per these installation instructions This product is compatible with AWM Series Arms Posts and Wall Channels The manufacturer accepts no res...

Page 9: ...hould always face towards the user ure Knob is undone lastic sleeve Tip push knob to aid insertion 2 Slide post clamp into channel 2 Remove rotation ring 1 Press 2 Lift 3 Hold clamp in desired positio...

Page 10: ...product is installed as per these installation instructions This product is compatible with Atdec AWM Series products The Dynamic Arm AWM AD requires a Channel Clamp AWM LC sold separately for instal...

Page 11: ...e arm will be attached to The tag on the ring should always face towards the user 180 360 OR Default Position Flipped Position Tag 1 Press 2 Lift 3 2 Attach VESA head onto monitor with provided screws...

Page 12: ...to the recorded amount then fine tune the tension by following steps 6 3 to 6 5 Arm Tension Gauge Marker Heavier Monitor Lighter Monitor 6 Adjust arm tension 6 1 To accurately set the tension of the a...

Page 13: ...riple arm set ups Note Ensure enough cable slack is given to allow for movement of the monitor Push 6 Monitor arm cable management 6 1 Plug cables into the monitor and route the cables down the arm us...

Reviews: