background image

AWM-LR Page 3 of 4

5. Adjust the ball joint tension

6. Cable Management

4. Mount monitors onto crossbar

5.1.

 If the monitors are not holding 

position or are stiff to move, adjust 
the tension plate by tightening or 
loosening the three screws.

NOTE: 

Adjust 3 screws 

evenly

 

in small increments

NOTE: 

Support the monitor 

while making adjustments.

+

-

3mm
Hex Key

IMPORTANT!

  

Ensure enough cable slack is given to allow for movement of the monitors.

4.1. 

Hook the top of the VESA 

plate onto the ball joint mount.

4.2. 

Gently push the bottom of the 

monitor until the VESA plate locks 
into place.

4.3. 

(OPTIONAL) Tilt the monitor 

upwards to install the security screw.

Tilt Up

Push

Click

Hook 

Repeat steps 4.1 to 4.3 for second monitor

Reviews: