Make sure before the boiler is put into operation that the boiler and installation have been fully vented. Vent the gas line and open the gas isolation
valve to the boiler. The boiler requires no adjustment of the burner pressure and quantity as it has been set in the factory and should not be reset.
Commissioning the boiler
Turn on the boiler
electrical supply.
After filling the 7 minute air purge program
starts;
Device discovery...
14.09.18
Airpurge active
1.7 bar
19°
25/07/18 09:00
80°
60°
ECO
AUTO
DHW Active
1.1 bar
19°
25/07/18 09:00
80°
60°
ECO
AUTO
DHW Active
1.1 bar
1
Vent the entire heating installation
starting at the lowest point;
4
When the boiler starts up for the first time
the following screens will be shown:
Initializing...
14.09.18
2
Check the water pressure and top up if
necessary to 1.0 – 1.2 bar;
5
3
17