5 OPERATION
64
5.14 Lift Arm Brace
When the lift arms must be left in
the raised position, the lift arm
brace must be engaged.
To install:
1.
Lower the lift arms, stop and
remove any attachments and
park the machine on firm and
level ground.
2.
Have an assistant withdraw
the retaining pins from the lift
arm brace (on the fender) and
remove the brace.
3.
Raise the lift arms to the
upper limit to allow for brace
installation.
4.
Have the assistant place the lift arm brace onto the top side of the cylinder
ram and install the retaining pins to secure it there, then stand clear.
5.
Slowly lower the lift arms until they come to rest on the brace.
To remove:
1.
Raise the lift arms until they are clear of the brace.
2.
Have an assistant withdraw the retaining pins and remove the brace from
the cylinder, then stand clear.
3.
Lower the lift arms to the lower stop.
4.
Have the assistant position the lift arm brace over the lift arm brackets on
the fender and install the retaining pins to secure it there.
5.14-1
5.14-2
Do not go beneath unsecured lift arms. Always install the lift arm brace
prior to going beneath the lift arms while raised.
VT-70 High Output US ISO O&M
0404-853 2019-09
Summary of Contents for VT-70
Page 8: ...6 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 30: ...28 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 32: ...30 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 38: ...36 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 56: ...54 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 58: ...56 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 68: ...66 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 76: ...74 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...