5 OPERATION
55
5.1 General Information................................ 57
5.2 Pre-Operation Safety Checklist........... 57
5.3 Starting Procedure .................................. 58
5.4 Surface Preservation............................... 59
5.5 Filling the Bucket ..................................... 59
5.6 Grading ........................................................ 60
5.7 Leveling ....................................................... 60
5.8 Loading........................................................ 61
5.9 Fastening Attachments.......................... 61
5.10 Unfastening Attachments .................. 62
5.11 Power Quick Attach .............................. 62
5.12 Operation on Inclines .......................... 63
5.13 Shut Down Procedure ......................... 63
5.14 Lift Arm Brace ......................................... 64
Page
VT-70 High Output US ISO O&M
0404-853 2019-09
Summary of Contents for VT-70
Page 8: ...6 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 30: ...28 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 32: ...30 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 38: ...36 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 56: ...54 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 58: ...56 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 68: ...66 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...
Page 76: ...74 VT 70 High Output US ISO O M 0404 853 2019 09 This Page Intentionally Left Blank ...