ASUS Z9PE-D16 Series
2-9
2. Press the left load lever with your
thumb (A), then move it to the left
(B) until it is released from the
retention tab.
To prevent damage to the socket
pins, do not remove the PnP cap
unless you are installing a CPU.
B
A
E
D
C
4. Press the right load lever with your
thumb (C), then move it to the right
(D) until it is released from the
retention tab. Lift the load lever in
the direction of the arrow (E).
3. Slightly lift the load lever in the
direction of the arrow.
Load lever
Summary of Contents for Z9PE-D16 Series
Page 1: ...Motherboard Z9PE D16 Series Z9PE D16 Z9PE D16 2L ...
Page 23: ...ASUS Z9PE D16 Series 2 5 2 2 3 Motherboard layout Z9PE D16 Z9PE D16 2L ...
Page 60: ...2 42 Chapter 2 Hardware information ...
Page 186: ...6 34 Chapter 6 Driver installation ...
Page 189: ...ASUS Z9PE D16 A 3 A 1 Z9PE D16 block diagram ...
Page 190: ...A 4 Appendix A Reference information A 2 Z9PE D16 2L block diagram ...
Page 194: ......