2-5
ASUS RS720Q-E7/RS12, RS724Q-E7/RS12, RS726Q-E7/RS12
2. Press the left load lever with your
thumb (A), then move it to the left
(B) until it is released from the
retention tab.
To prevent damage to the socket
pins, do not remove the PnP cap
unless you are installing a CPU.
B
A
E
D
C
4. Press the right load lever with your
thumb (C), then move it to the right
(D) until it is released from the
retention tab. Lift the load lever in
the direction of the arrow (E).
3. Slightly lift the load lever in the
direction of the arrow.
Load lever
Summary of Contents for RS720Q-E7/RS12
Page 1: ...2U Rackmount Server RS720Q E7 RS12 RS724Q E7 RS12 RS726Q E7 RS12 User Guide ...
Page 10: ... ...
Page 52: ...Chapter 3 Installation options 3 6 ...
Page 54: ...4 2 Chapter 4 Motherboard information 4 1 Motherboard layouts Z9PH D16 For RS720Q E7 RS12 ...
Page 55: ...ASUS RS720Q E7 RS12 RS724Q E7 RS12 RS726Q E7 RS12 4 3 Z9PH D16 QDR For RS724Q E7 RS12 ...
Page 56: ...4 4 Chapter 4 Motherboard information Z9PH D16 FDR For RS726Q E7 RS12 ...
Page 158: ...6 40 Chapter 6 RAID configuration ...