6.
Rough in the Electrical Supply, if Needed
As necessary, rough in the fireplace electrical supply per NEC and local codes.
7.
Install the [Optional] Blower Kit before Installation in the Framing
1.
Remove the left side blower cover panel screw, and blower cover panel in
Table 12
. Retain the panel and screw
for later reinstallation.
2.
Slide the blower through the opening and position it with the bracket oriented to the front of the firebox and
the blower discharge to the rear of the firebox. Bend the two tabs in the firebox floor to secure the blower to
the floor.
3.
Reinstall the blower cover panel and secure with the removed screw.
4.
Access the blower supply wiring through the front of the fireplace and plug it into the junction box in the right,
rear of the fireplace (
Figure 32
).
5.
Install the blower control switch according to its included instructions.
Installing Non-Combustible Fireboard Standoff in 35” and 40” Contemporary Fireplaces
A non-combustible standoff board is provided for 35” and 40” Contemporary fireplaces to prevent overlap of drywall or other material
of portions of the fireplace that may be prone to the buildup of heat. It is supported by a middle bracket and two side brackets.
Separate and note metal side
(2) and center (1) brackets.
Step 1:
Remove two screws from the top and side of the unit. Bend the side bracket securing tab
over the edge of the unit and secure. Secure bracket to the top through the clearance screwhole.
Step 2:
Remove the three screws that align with the clearance
screwholes from the top of the unit. Secure the center bracket to
the top center of the fireplace
Step 3:
Top of front fireboard
standoff should be flush with
top standoffs (not shown).
Step 4:
Fireboard standoff
can be secured to the capture
screwholes.