HEATING BOILERS: Astra G-50E, Astra G-80E

The heat consumption circle uses the heat accumulated in the tank. The circle consists of a room thermostat or a programmed 

control processor, room or/and outside temperature sensors, 3-way servo drive, mixing valve, underfloor heating system, 
radiators, piping, fittings. The programmed processor controls a 3-way mixing valve, which allows more or less heat (45-
60°C) into the radiators, according to demand. This way of heat consumption allows the heating of the house as long as the 
tank stores heat independently from the boiler.

• ReQUIReMenTs foR connecTIon of THe boIleR To THe HeaTInG sYsTeM

The following requirements should be fulfilled when installing the boiler:
• The boiler should be installed in a closed heating system with a closed membranous expansion vessel, the volume of which should 

be no less than 10% of the total volume of the system. A closed heating system is a kind of system with no free access to atmospheric 
air, which actuates corrosion. Due to this, drainage of water from the system without an important reason is undesirable, e. g. in 
summer. It is also necessary to ensure watertightness of the system in order to need fewer refills with fresh water containing free 
oxygen. The quantity of the additional water let in should not exceed 5% of the system water volume per year;

• The boiler is connected to the heating system through connection pipes 6 – water supplied to the heating system and 

11 – water returning from the heating system (Fig. 1);

• Internal threads G 1½” of pipes 6 and 11 ;
• There is a nipple 12 for water filling or draining from the boiler (Fig. 1);
• Internal thread G ½” of the nipple 12; 
• A pressure relief valve conforming to norm EN1268-1 is to be installed in the heating system as close to the boiler as 

possible at a location easy to reach by hand;

• pressure relief valves and control devices must conform to the following technical characteristics:

Instrument

Technical characteristics

Type of boiler

Pressure relief valve

Connection diam. does not exceed ¾”, set opening pressure 3 bar Astra G-50E, Astra G-80E

Thermometer-manometer

Range of temperature 0-120°C, pressure 0 – 4.0 bar

All boilers

 There must be no ball valves installed between the boiler and the pressure relief valve.

• Water from the pressure relief valve should be conducted via an offtake pipe. It should be conducted in a way that will 

allow the water passing through the pressure relief valve to flow safely, avoiding exposure of people and electrical parts of 
the boiler. The diameter of the offtake pipe should be no less than the diameter of the offtake opening connection nipple of 
the safety valve. The total length of the offtake pipe should not exceed 2 m. No more than 2 elbow joints at angles of 90° are 
to be used when installing this duct. No ball, mixing or other valves are to be installed in the water offtake pipe. This offtake 
pipe is to be installed in a way that will make the flow of the passing water visible. If part of the pipe installed is hidden, e. g., 
in a sewerage pipe, then such a pipe should have a special funnel enabling visual observation of the offtake flow of water.

 operation of the pressure relief valve is to be checked at least once a month. The valve is opened 

for a short period of time, by turning its head, to reveal a small amount of the offtake water. If this is not 

done periodically, the parts of the valve can stick together due to high temperature and fail to open, when 

required. In case the safety valve fails to open in an emergency situation, serious damage to the boiler and 

the heating system can occur as well as hazard to the health and life of people.

 In order to guarantee natural water circulation of water in the boiler, the pipework between the boiler 

and the mixing valve in the line boiler–mixing valve–boiler is to be of the same diameter and correspond to 

Summary of Contents for G-50E

Page 1: ...E ASTRA MACHINERY PLANT AB ANNO 1929 CONTACT INFORMATION OFTHE FACTORY MACHINERY PLANT ASTRA AB ULONŲ G 33 LT 62161 ALYTUS LITHUANIA TEL 370 315 75449 FAX 370 315 52265 E MAIL INFO ASTRA LT WWW ASTRA GAS LT INSTALLATION AND OPERATION MANUAL ...

Page 2: ... Returning to the Boiler 12 Heating Output Water Temperature and Water Flow Relationship 12 Installation of the Boiler Room 13 Requirements for the Chimney 13 6 FUEL 14 7 OPERATION 15 Front Control Panel 15 Rear Control Panel 16 Electronic Boiler Regulator KR 4 3D 16 Preparation for Firing 17 Kindling Procedure of the Boiler 18 Fire Bed and Tips for Effective Boiler Stoking 18 Regulation of the Bo...

Page 3: ...sin from the boiler flues as instructed in this manual 1 7 The room where the boiler is installed should have fire extinguishing tools fire extinguishers sand box shovel and other tools 1 8 Do not place flammable materials on or near the boiler 1 9 Connect the boiler to the electric system only via a three pole plug plugged into an adequate three pole socket with earthing Protect connection cable ...

Page 4: ...ator 11 Return waterpipe 12 Waterdrainnipple 13 Connectionsofthecoolingserpentine 14 Fluepipe 15 Fluecleaningcap 16 Smoketemperaturesensor 17 Safety ventilatorshutdown95 Cthermostatsensor 18 Watertemperaturesensor 19 Uppercombustionchamberopeningtotheflue 20 Primaryairinlet opening 21 Secondaryairinletopening 22 Ceramicburner 23 Ceramicchopper 24 Ceramicsegment 25 Openingtotheflue Astra G boiler m...

Page 5: ...stem bar max 3 0 3 0 Testing pressure of the boiler bar 4 5 4 5 Max allowable water temperature in the boiler C 108 108 Max allowable operating water temperature in the boiler C 95 95 Electric characteristics voltage V frequency Hz 220 50 220 50 average power used W 50 50 Level of electric protection of the boiler IP30 IP30 Dimensions height mm 1315 1475 width mm 660 660 depth mm 1230 1230 Weight ...

Page 6: ...er to remove the sealingropefrombetweentheceramicburnerandtheframeoftheboiler thenthisceramicinsertcanberemoved Fig 2 Ceramic inserts and their positions 1 Ceramic burner 2 Ceramic chopper 3 Ceramic segments Ceramic element Boiler type G 50E G 80E 1 Burner 1 a ŠK 50 00 008 1 1 1 b ŠK 50 07 001 1 1 2 Chopper 2 a G 32 01 2 2 2 b G 32 02 1 1 3 Segments 3 G 18 00 004 01 2 2 2 a 2 b 3 1 a 1 b 2 b Turbu...

Page 7: ...oiler and reduce the temperature of the smoke in the chimney it is sufficient to remove the ashes 1 2 times per week 4 TRANSPORTATION STORAGE UNPACKING Theheatingboileristobetransportedandpackagedinaccordancewiththedocumentationofthemanufacturer protected from precipitation and dust It can be transported only in vertical position fastened to avoid sliding and falling If the boiler istransportedino...

Page 8: ...tomatically opens the flow of cold water from the public water supply network through the coolingserpentine whereitabsorbstheexcessiveheatenergyand flowsoutintothesewage Thesensorofthevalvewiththeexternal thread isscrewedontothesocketontherearwalloftheboiler Technical data of the thermostatic safety valve are the following Opening temperature 95 C Maximum operating temperature 110 C Operating pres...

Page 9: ...h Membrane Expansion Vessel Thermostatic Mixing Valve Domestic Water Preparation From Water Supply Hot Water Air Outlet Other Notations Automatic Water Addition Valve Accumulation Tank Thermometer 3 Way Servo Drive Mixing Valve Return Overflow Valve Filter Heating System Supply Heating System Return Automatic Air Outlet Return Valve Valve Pressure Relief Valve Pump Thermometer Manometer Manometer ...

Page 10: ...control devices must conform to the following technical characteristics Instrument Technical characteristics Type of boiler Pressure relief valve Connectiondiam doesnotexceed setopeningpressure3bar Astra G 50E Astra G 80E Thermometer manometer Range of temperature 0 120 C pressure 0 4 0 bar All boilers There must be no ball valves installed between the boiler and the pressure relief valve Water fr...

Page 11: ...switch S2 ventilator switch SK emergency ventilator shutdown 95 C thermostat F fuse M ventilator circulation pump of the heating system KR electronic controller U1 2 water temperature sensors U3 smoke temperature sensor the diameter of the connection pipes of the boiler Circuit Diagram of the Boiler An electric installation with earthing in accordance with the electric safety regulations in force ...

Page 12: ...cle together with a Swedish made thermoregulationdevice Laddomat21 100 Makesurethatthe Laddomat issuppliedwiththe72 Cthermostatcartridge The mentioned temperature is the one at which the valve of the device opens completely However the actual temperature of the water returning from the system and getting into the boiler after mixing is 5 6 C lower The higher the temperature of the return water is ...

Page 13: ...the boiler and the chimney should be installed at an inclination towards the boiler All junctions should be carefully tightened using a heat resistant material and insulated using thermal insulation Ifanadditionaldamperisinstalledbetweentheboilerandthechimneyforthedraughtcontrolpurpose thedampershouldnotclosemorethan2 3ofthecross sectionareaoftheopeninginitsfullyclosedposition Requirements for the...

Page 14: ...rewood preparation put split wood in a properly ventilated place if possible in a sunlit place Fig 8 Positioning of a chimney in respect to vicinity objects 6 FUEL Theboilerisfiredonlybywoodlogsandwoodbriquettes Itispossibletofireitwithfuelpeatbriquettes howevertheoperation oftheboilerbecomeslesscomfortablefortheuserasitisnecessarytoremovetheashesofthesehighlyash producingbriquettes after each loa...

Page 15: ... regulator KR 4 3D and Boiler kindling procedure Rear Control Panel The following safety devices are installed in the rear control panel thermal fuse 1 and electric fuse 2 Fig 10 The purpose of the thermal fuse otherwise called the maximum boiler temperature emergency thermostat is to switch off the boiler ventilator if watertemperatureintheboilerexceedsthemaximumpermissible95 Cduetounforeseenreas...

Page 16: ...reoftheboilerwater Inordertochangeit theappropriatebuttonmustbepressed forincreasingand for decreasingthetemperature Afterseveralsecondsafterthelastpressofabutton thesetpointtemperatureissavedandtheindicator returns to showing the measured temperature of the boilerwater When it indicates the setpoint temperature a dot lights up beside the readout When the indicator indicatestherealmeasuredtemperat...

Page 17: ...ith the rear wall of the boiler Fig 2 Place two ceramic segments 3 Fig 2 on the chopper so that they contact the walls of the boiler chamber Fill the heating system with water The filling pressure should be 0 2 bar bigger than the hydrostatic pressure yet it must notexceedtheoperatingpressureoftheboiler Afterfillingthesystemwithwater performavisualcheckofthetightnessof the entire system Perform it...

Page 18: ...ber The output of the boiler ventilator is deliberately chosen with the purpose of sufficiently supplying the fire bed with air Then the most effective combustion of wood gases takes place Avoid a situation when the volume of the fire bed expands several times This situation can occur if very dry and thinly cut wood gets loaded into the fuel chamber Consequently the volume of the fire bed increase...

Page 19: ...ot enter the room Water temperature and pressure in the system are checked by readings of the thermometer manometer installed in the heating system Combustion Control Thestatusoftheboilerfiringprocesscanbeperceivedfromtheregulatorlamps Firingon or Firingoff seedescriptionof the regulators KR 4 3 Fig 11 The flame in the boiler can be checked by opening the door of the lower combustion chamber when ...

Page 20: ...r without the smoke temperature sensor Cleaning the Boiler Ashesareremovedfromtheboilerevery4 7days Openthedooroftheuppercombustionchamberandshovelashesdown to the lower chamber Open the door of the lower chamber take out only ceramic segments 3 Fig 2 pour ashes to a metal box Itisnotnecessarytotakeoutthetriangleceramicchopper2 Fig 2 atthetimeofcleaning ashesunderneathitmaybe raked using scraper I...

Page 21: ...tat has tripped light of the ventilator switch is off Unsrew the thermostat 1 Fig 10 cover and press the button under it It is absolutely required to define and remove the causes of tripping of this thermostat in order to avoid hazards to property and human health Electronic regulator KR 4 3 or ventilator is faulty Replace Power supply failure Check electric fuses of the electric panel of the buil...

Page 22: ... heat exchanger is limed in case the water or other liquid inside the boiler has been frozen in case of fault of the boiler due to improper operation in case of fault of the boiler due to improper connection to power supply in case the boiler parts are mechanically damaged in case the boiler is connected to the heating system not in accordance with the diagrams and requirements of the operation ma...

Page 23: ...ne Installation date Installation data Heightofthechimney Diameteroftheflue Draughtofthechimney Other information concerning installation The boiler was tested on site the control and safety elements were checked and found to be operating properly Person responsible for installation and testing Name surname signature of the employee I accept the installation works Name surname signature of the cli...

Page 24: ...repaired by Company technician Address Telephone Repairdate Informationonfault worksperformed Signatureofthetechnician Boiler repaired by Company technician Address Telephone Repair date Informationonfault worksperformed Signature of the technician ...

Page 25: ...attheabove mentionedproductsconformtotherequirementsofdirectives97 23 EECArticle2 3and2006 95 EEC The following standards were applied for the above mentioned products LST EN 303 5 LST EN 12828 LST EN 60335 1 LST EN 60529 ProcedureofconformityevaluationinaccordancewithArticle2 3of97 23 EECwasperformedby Inspecta www inspecta com Certification No 2 4 2 1 619 2012 Alytus 201 date Gražvydas Eimanavič...

Reviews: