ASTi Telestra Target Operations & Maintenance Manual (Ver. 2, Rev. M)
Copyright © 2020 Advanced Simulation Technology inc.
9
Chapter 3: System Installation
See the
Telestra
Quick Start Guide (DOC-01-TEL4-QSG-1) for initial Target setup and IP
address assignment.
3.1. Receiving and Unpacking
Upon receipt of the Target, check that all packages are received according to the shipping
manifest and that no apparent damage has occurred during shipping. Do not accept packages that
are obviously damaged without first consulting with the carrying authority.
Unpack and carefully remove the Target components from their shipping packaging in accordance
with procedures common to industry standard practices. Be sure to observe all notes, caution or
warning labels that may be present on the outside and inside of the shipping packages.
3.2. Parts Inventory
After all equipment is removed from the packaging, verify equipment received against the
shipping invoice. Notify ASTi immediately of any discrepancies. All Targets are shipped with
engineering drawings that identify the system. Packing lists also provide detailed information
about the shipment and may contain important notes.
3.2.1. System Configuration
The current configuration includes a removable hard drive and CD/DVD drive, two (2) network
ports (expansion to 4 is available at additional cost), and four USB interfaces. No DSP cards are
installed or required.
Optional
Figure 3: Example Target Rear Panel