®
ASSA ABLOY
Step 8: Install Top Chassis
Prepare the top of the door per the door template Appendix A. Check alignment
of the top latch location in the frame to assure it lines up with the Top Chassis
pusher.
Insert two 3/8" dia. sexnut into the holes on the outside of the door.
Screw the upper rod (approximately 1/2 of the way) onto the top chassis.
Position the shim and Top Chassis so that the mounting holes line up with the
holes in the door. Insert and finger tighten the 4 mounting screws provided. Note
that the two flat head security screws are for the lower positions.
Depress the touchbar and slide the top rod connector into the slot on the latch
head slide. With the touchbar depressed the top slide pusher should be flush with
the top reinforcement. If adjustment is necessary the rod can be rotated
clockwise to shorten it and counterclockwise to lengthen it.
Install the rod guide for the upper rod per the template in Appendix A.
Flush
FASTENERS:
1.550
#12-24 Allen Head Machine - Socket
1-1/4"
#12-24 Sexnut
3/8" Dia.
1"
1"
#10-24 Button Head Machine - Socket
FM329 (11/18)
8 of 14
Pusher
1-1/8"
#12-24 Flat Head Machine - Socket
Copyright © 2012 Corbin Russwin Inc., an ASSA ABLOY Group company.
All rights reserved. Reproduction in whole or in part without the express written
permission of Corbin Russwin, Inc. is prohibited.