background image

®

ASSA ABLOY

General Information

Copyright © 2012 Corbin Russwin Inc., an ASSA ABLOY Group company. 
All rights reserved. Reproduction in whole or in part without the express written
permission of Corbin Russwin, Inc. is prohibited. 

FM329 (11/18)

This device is intended to be part of an integrated door, frame and hardware assembly UL-
approved for both FEMA 361 and ICC 500 guidelines for out swing doors.  This instruction 
sheet will take you through the necessary steps to install this device.

Step 1: Check Before Starting 

Check to assure that the Top and Bottom latch openings in the frame align with the vertical centerline location for the 
top and bottom chassis centerline location (refer to page 3 "Mark Door", and Appendix B).

Step 2: Tools Required 

Measuring Tape - Power Drill – Level – Square – Center Punch or Center Drill - Hacksaw or any power cutter (to cut 
rail if necessary) – Screwdrivers (Phillips #2 and #3), Allen Head Hex Wrenches (5/32", 1/8"), Drills (3/8", 1/4", 5/16", 
7/16"), Drills and Taps (13/64" or #7 Drill and 1/4"-20 Tap), (11/64" or #16 Drill and #12-24 Tap), (5/32" or #25 Drill 
and #10-24 Tap).

Step #

1
2
3
4
5
6
7
8
9

10
11
12

Table of Contents

Check Before Starting
Tools Required
Mark Door
Size Device
Install Device
Install Device Strike
Prepare Top Rod
Install Top Chassis
Install Bottom Chassis
Install Top Latch
Install Bottom Strike
Install Covers

Appendix A Door Template
Appendix B Top Frame Template
Appendix C Plastic Door Template

Page

2
2
3
3
4

5-6

7
8
9

10
10
11

12
13
14

Door Must Not Sag

Door Must Not Bind

Door Must Not Be Warped

Door Must Swing Freely

2 of 14

Summary of Contents for Corbin Russwin FE5400S Series

Page 1: ...bar depressed 3 Turn key 1 4 turn clockwise Not a feature of fire labeled devices Top Chassis Cover Upper Rod Rod Guide Bottom Chassis Cover Lower Rod Rod Guide End Cap Bottom Rail Maintenance 1 Perio...

Page 2: ...on refer to page 3 Mark Door and Appendix B Step 2 Tools Required Measuring Tape Power Drill Level Square Center Punch or Center Drill Hacksaw or any power cutter to cut rail if necessary Screwdrivers...

Page 3: ...gn the device with the level horizontal line created while marking the door LHR DOOR OPEN 90 INSIDE FACE Slide the End Cover on and verify no gaps exist between the Touch Bar End Cover and End Cover p...

Page 4: ...1 4 20 Pan Head Machine Phillips 1 1 4 4 of 14 End Clamp NOTE If the device has been sized in the field a 1 4 6 diameter thru hole will need to be drilled so that the center sexnut and fastener can be...

Page 5: ...oor application Fig A 12 24 x 1 1 8 socket head flat head screw 1 5 8 long for single door application Locking Strike Locking Spacer Strike Spacers Add strike block for single door application only FA...

Page 6: ...the other two screw locations at this time Recheck the alignment to the centerline of the device Reassemble the strike assembly and finger tighten the flat head screws using a 1 8 allen wrench so tha...

Page 7: ...13 16 960 Top Rod Connector PRESS FLUSH Example of opening less than 84 using 80 as example Subtract your opening from 84 and cut off the necessary amount 84 minus 80 4 shorten rod by 4 Example of op...

Page 8: ...lower positions Depress the touchbar and slide the top rod connector into the slot on the latch head slide With the touchbar depressed the top slide pusher should be flush with the top reinforcement I...

Page 9: ...ns Depress the touchbar and insert the bottom rod connector into the slot on the latch head slide The bottom bolt should be retracted so that it only projects 1 16 below the bottom of the door in the...

Page 10: ...pared for installation refer to Appendix B page 13 for preparing the frame Allen Socket Head FASTENERS Step 11 Install Bottom Strike Mount the bottom strike as illustrated in the template Appendix B T...

Page 11: ...sembly and secure with the two 8 by 1 4 long fasteners provided Place the top chassis cover over the Top Chassis and secure with the four 8 32 by 5 16 long fasteners provided Place the Bottom Chassis...

Page 12: ...e See Step 5 These 3 holes can be located using the actual device See Step 5 FM329 11 18 12 of 14 Copyright 2012 Corbin Russwin Inc an ASSA ABLOY Group company All rights reserved Reproduction in whol...

Page 13: ...Frame Template FM329 11 18 13 of 14 Copyright 2012 Corbin Russwin Inc an ASSA ABLOY Group company All rights reserved Reproduction in whole or in part without the express written permission of Corbin...

Page 14: ...lastic template After marking the vertical centerline swing the door to the closed position and visually check to assure that the vertical centerline of the rods latches strikes will align with the ce...

Page 15: ...BLOY FM329 11 18 Copyright 2012 Corbin Russwin Inc an ASSA ABLOY Group company All rights reserved Reproduction in whole or in part without the express written permission of Corbin Russwin Inc is proh...

Page 16: ...BLOY FM329 11 18 Copyright 2012 Corbin Russwin Inc an ASSA ABLOY Group company All rights reserved Reproduction in whole or in part without the express written permission of Corbin Russwin Inc is proh...

Reviews: