®
ASSA ABLOY
General Information
Copyright © 2012 Corbin Russwin Inc., an ASSA ABLOY Group company.
All rights reserved. Reproduction in whole or in part without the express written
permission of Corbin Russwin, Inc. is prohibited.
FM329 (11/18)
This device is intended to be part of an integrated door, frame and hardware assembly UL-
approved for both FEMA 361 and ICC 500 guidelines for out swing doors. This instruction
sheet will take you through the necessary steps to install this device.
Step 1: Check Before Starting
Check to assure that the Top and Bottom latch openings in the frame align with the vertical centerline location for the
top and bottom chassis centerline location (refer to page 3 "Mark Door", and Appendix B).
Step 2: Tools Required
Measuring Tape - Power Drill – Level – Square – Center Punch or Center Drill - Hacksaw or any power cutter (to cut
rail if necessary) – Screwdrivers (Phillips #2 and #3), Allen Head Hex Wrenches (5/32", 1/8"), Drills (3/8", 1/4", 5/16",
7/16"), Drills and Taps (13/64" or #7 Drill and 1/4"-20 Tap), (11/64" or #16 Drill and #12-24 Tap), (5/32" or #25 Drill
and #10-24 Tap).
Step #
1
2
3
4
5
6
7
8
9
10
11
12
Table of Contents
Check Before Starting
Tools Required
Mark Door
Size Device
Install Device
Install Device Strike
Prepare Top Rod
Install Top Chassis
Install Bottom Chassis
Install Top Latch
Install Bottom Strike
Install Covers
Appendix A Door Template
Appendix B Top Frame Template
Appendix C Plastic Door Template
Page
2
2
3
3
4
5-6
7
8
9
10
10
11
12
13
14
Door Must Not Sag
Door Must Not Bind
Door Must Not Be Warped
Door Must Swing Freely
2 of 14