11
Mechanical installation
11.1
Surface mounted installation
The operator is mounted on either side of the door header with two available spindle locations,
Standard 3 3/4" (95 mm) and High performance 8 1/4"(210 mm) between hinges and outgoing
shaft, depending on type of doors.
The Standard installation is best suited according to ANSI / BHMA A156.19 and ADA 28 CFR
Part 3. The High performance installation is used in windy environments, when heavy doors
are used and when there are big differences in pressure.
The door is controlled with a push or pull arm system.
Note: Consider all power wire entry locations and signaling wires before preparing back plate.
High performance 8 1/4" (210 mm)
Standard 3 3/4" (95 mm)
B
A
C
B
C
A
10" (255 mm)
A
28 3/8" (720 mm)
B
1 3/8" (36 mm)
C
5 1/2" (140 mm)
A
28 9/16" (725 mm)
B
28 5/8" (726 mm)
C
8
1/4"
1
11/16"
3
3/4"
1
11/16"
1007718-US-3.0
Issue 2012-06-27
30
11 Mechanical installation
Summary of Contents for Besam SW200i US
Page 26: ...Product label P N 1008999 1007718 US 3 0 Issue 2012 06 27 26 9 Options ...
Page 38: ...11 1 2 PULL PAS arm system 1007718 US 3 0 Issue 2012 06 27 38 11 Mechanical installation ...
Page 51: ...12 3 How to route the cables 51 Issue 2012 06 27 1007718 US 3 0 12 Electrical connection ...