42
Operation - 2
ASSEMBLY OF EXTRACTION ARM:
1) For transport protection mobile filter unit and extraction arm is packed separately
and delivered.
2) Extraction arm is delivered ready to use.
3) In order to assemble extraction arm, follow below points in order:
- 6 pcs. M8 socket cap bolts are assembled on the inlet flange of the mobile filter
unit! Dissemble these bolts prior to extraction arm assembly!
- Place extraction arm inline with mobile filter inlet flange!
- Place socket cap bolts through extraction arm flange and screw bolts firmly!
- WARNING!
Support extraction arm until all bolts are assembled firmly!
Otherwise there is a possibility of damage of mobile filter unit
inlet flange bolt connection rivet nut!
M8 (x6)
US
E
R
G
UI
D
E
Summary of Contents for CleanArc M100
Page 2: ......
Page 3: ...M100 KULLANIM KILAVUZU 2 Yıl Garanti MOBİL DUMAN EMME ÜNİTESİ ...
Page 33: ...M100 2 Years Warranty MOBILE FUME EXTRACTION UNIT USER GUIDE ...
Page 57: ...55 USER GUIDE ...
Page 58: ...56 USER GUIDE ...
Page 59: ......