8
DUCTWORK INSTALLATION
We strongly recommend that the hot air ductwork be installed by a home heating specialist. If doing the installation
yourself, before you decide which installation will best suit your needs, consult a quali
fi
ed heating technician and
follow his recommendations as to the safest and most ef
fi
cient method of installation.
This furnace can be installed in three ways, as a stand alone unit, parallel, and in series with an existing furnace.
SUPPLY AIR (HOT AIR) PLENUM
The warm-air supply duct shall be constructed of metal in accordance with NFPA 90B, 2-1.1. The plenums installed
to the furnace shall be constructed of metal in accordance with NFPA 90B, 2-1.3.
When installing this furnace the hot air plenum is to have a minimum height of 24” (610mm) if the top of the
fi
rst
vertical section is not
fl
ush with the top of the
fi
rst horizontal section of ductwork. If the top of the plenum is
fl
ush
with the top of the
fi
rst horizontal section of ductwork then the minium height is 15” (381mm).
RETURN AIR (FRESH AIR)
The return (fresh) air intake on the furnace is on the rear of the unit. The ductwork must be mechanically attached
to the unit or blower kit box with sheet metal screws to ensure a proper operation.
26
.2
5
6.
12
SUPPLY AIR (HOT AIR)
DUCTWORK OUTLET SIZE
SUPPLY AIR PLENUM
MINIMUM HEIGHT OF 24”
SUPPLY AIR PLENUM WITH
MINIMUM HEIGHT OF 15”
Summary of Contents for AF700
Page 10: ...10 CENTRAL INSTALLATION ADD ON INSTALLATION ...
Page 12: ...12 INSTALLATION D INSTALLATION E ...
Page 13: ...13 INSTALLATION H TOP VIEW FRONT VIEW INSTALLATION F INSTALLATION G ...
Page 32: ...32 NOTES ...
Page 33: ...33 NOTES ...