5
UNPACKING AND PRE-ASSEMBLY
UNPACKING
1)
Remove all packaging from the furnace.
2)
Remove the supplied tools and parts from the furnace.
A) The supplied ash shovel and poker from the heat exchanger tube, behind the heat exchanger door at
the top of the unit.
BRICK ALIGNMENT
Inspect for any damage. Ensure that the bricks and ash grate are positioned correctly and not broken (see
illustration for proper brick arrangement).
TOOLS AND MATERIALS NEEDED FOR INSTALLATION
The following is a list of tools and materials needed to install your furnace.
• 7/16” socket wrench.
• 5/16” socket (Best if using a power drill and a socket bit).
• Pair of pliers or channel-locks.
• Power drill with an 1/8” drill bit to install sheet metal screws into connector pipe..
• Sheet metal screws.
• Non-combustible
fl
oor protector as speci
fi
ed in this manual.
• All chimney and chimney connector components required for your particular venting installation..
• Electrical wiring tools and supplies.
• Ductwork for supply and return air.
PROPER FIRE BRICK ALIGNMENT
Summary of Contents for AF700
Page 10: ...10 CENTRAL INSTALLATION ADD ON INSTALLATION ...
Page 12: ...12 INSTALLATION D INSTALLATION E ...
Page 13: ...13 INSTALLATION H TOP VIEW FRONT VIEW INSTALLATION F INSTALLATION G ...
Page 32: ...32 NOTES ...
Page 33: ...33 NOTES ...