EN
29
ASIN Aqua NET
Maintaining ASIN Aqua
The ASIN Aqua requires regular visual inspection and maintenance
to ensure optimal performance. The table below gives a list of areas
to be regularly checked and recommendations for replacement time.
Spare part list
Pump Tube replacement
It is recommended to change the tube once a year in order to prevent
the possible failure. The tube change is made in the following way:
Turn the pump counterclockwise and remove it
Loosen both ends of the tube and remove the tube
Cut the tie strips and release the tube
Use a new tube and secure it with new tie strips
Insert the tube back to the pump and grease it with supplied grease
Place the pump back
# 12005 Injection valve
# 12071 CLF electrolyte
# 12065 Buff er pH 7,00
# 12052 CLF probe
# 13087 Replacement tube
for injection valve
# 12029 CLF membrane
# 12015 Redox probe
# 12073 Pump tube set
# 12014 pH probe
Cassette
Rotor
Base – Geared
Pump Tube