ASBER – BAR EQUIPMENT: Operations and Service Manual/ Rev. JUN. 2015
PAGE 7
4
INSTALLATION
4.1
UNCRATING
Cut and remove the outer packaging. Cut the four (4) clamps that hold the refrigerator to the
skid. Lift the unit off the skid. If machine was laid down during this operation leave the cabinet
upright for 24 hours before plugging into power source. To install draft arm, first place rubber
washer over draft arm mounting holes in cabinet top and put beer line connector down through
hole. Next secure draft arm with four bolts provided. To retain complete mobility of the cooler,
the accessory CO2 tank (up to five pounds in size) must be placed inside the cabinet.
4.2
SEALING
WHEN SANITATION CODES REQUIRE SEALING TO FLOOR
THIS METHOD MAY BE USED
1. Tip cabinet and apply a bead of silicone seal on bottom edge of the base.
2. Return cabinet to upright position and using proper equipment, lift cabinet into
location.
Heavy appliances should not be used on the same circuit with the cooler.
CAUTION: If an extension cord is necessary, use only a three wire grounding type of wire, size 16
AWG or heavier; do not exceed 20 feet in length. The use of ungrounded cords or overloaded
circuit voids compressor warranty.
CLEANING OF CABINET
The exterior of the cabinet is painted and should be cleaned only with lukewarm water, taking
care not to scratch the paint. Mild detergents are also recommended. The interior can be
cleaned in a similar manner. THE CONDENSER MUST BE CLEANED AT REGULARINTERVALS.
FAILURE TO DO SO CAN CAUSECOMPRESSOR MALFUNCTION AND WILL VOID WARRANTY.
Clean approximately every six months, depending upon usage, dust, etc. Pull cabinet away from
wall and thoroughly vacuum the condenser and surrounding surfaces.