
Gree GMV6 DC Inverter VRF Units Service Manual
208
4.5.1 Mechanical Inspection
Step 1:
Switch off the power of the ODU.
Step 2:
Check whether the connector between the fan motor and fan drive board is firmly
connected.
Step 3:
Rotate the blades with a hand to check whether they can rotate smoothly and whether the
blades rub the baffle ring during rotation. If the blades are blocked during rotation, the motor needs to be
replaced; if the blades rub the baffle ring during rotation, check whether the blades and baffle ring deform
and needs to be replaced.
4.5.2 Electrical Inspection
Switch off the power of the ODU. Disconnect the connector between the fan motor and fan drive
board. Use a multimeter to measure the resistance of each contact point of the motor terminal. The
normal range of the resistance is shown in the following table. If any value is beyond the normal range,
the motor is damaged and needs to be replaced.
Terminal layout
Diagram of internal coils
Range of coil
resistance between
any two phases
3.W Blue
1.U Brown
2.V Black
U (BN brown)
V (BK black)
W (BU blue)
10.2Ω±7%
4.6 Compressor
Specifications
Description
Models: AA55PHDG-D1Y2, DA80PHDG-D1Y2
Compression refrigerant, recycling refrigerant.