Installation Overview |
23
To mount the 5- and 8-port switches, follow these steps:
1. In the required location, mark the position for the mounting screws. Refer to the diagrams below for
the ports-down mounting hole locations of R8R44A, R8R45A, and R8R46A.
Figure 11
R8R44A
Figure 12
R8R45A
Figure 13
R8R46A