Installation Overview |
17
R8R47A and R8R48A
Kit number 5300-1807
n
4 rubber feet
n
2 wall/table mounting screws
n
rack screws
n
1 tie strap
5555
R8R49A
Kit number 5300-1808
n
4 rubber feet
n
2 wall/table mounting screws
n
rack screws
n
1 tie strap
555
R8R50A
Kit number 5300-1809
n
4 rubber feet
n
2 wall/table mounting screws
n
rack screws
n
1 tie strap
Japan Power Cord Warning
Installation Procedure
These steps summarize switch installation. The rest of this chapter provides details on these steps.
Procedure
1.
Prepare the installation site
. If you have not already done so, carefully read the chapter
describing
Site Preparation and Switch Installation Precautions
2.
Verify that the switch passes self-test
.
3.
Mount the switch
.
4.
Connect power to the switch
.
5.
Connect the network devices
.
6.
(Optional) Install SFP transceivers
. Depending on where you install the switch, it may be easier to
install the SFPs first. SFPs can be hot-swapped—they can be installed or removed while the switch is
powered on.