
CAUTION: The rack rails are intended for ease of installation only, do not use rails to
support the switch in any extended position. Switch must be immediately secured with
screws after installation.
10. Install the air duct kit bezel by inserting it into the air duct base.
1
2
2
1
11. Dress the power cables and any RJ console cable out the slots in the sides of the bezel and secure the
bezel using two (2) 10-32 screws.
Install transceivers
Hold the transceiver by its sides and gently insert it into the switch until it clicks into place. When a
transceiver is inserted, the switch authenticates it. This can take 1-3 seconds, with the worst case being 5
seconds.
WARNING:
• The Aruba transceivers are Class 1 laser devices. Avoid direct eye exposure to the beam
coming from the transmit port.
• The transceivers operate only at full duplex. Half duplex operation is not supported.
• Use of supported genuine Aruba transceivers is always recommended. Non-Aruba SFP28/
QSFP+/QSFP28 transceivers are not supported. Non-Aruba SFP/SFP+ transceivers can be
used in unsupported transceiver mode, but no support or warranty will be provided. Should
you require additional transceivers, contact your Aruba sales representative or an authorized
reseller.
Chapter 3 Installing the switch
39