7

7. Before installing the cover, you must clear the access cutout to allow the antenna to extend. The 

access is shown in 

Figure 11

.

8. Once the AP is secured to the ceiling rail, install the cover by placing the hooks on the cover into the 

holes on the bottom of the base (

Figure 11

). Push the top of the cover towards to base until it clicks 

into places. 

Figure 11  

Installing the cover

Figure 12  

Completed ceiling installation

AP120_002

Access

cutout

Summary of Contents for PowerConnect W-AP124

Page 1: ...age 2 To install the AP 120 MNT CV on a ceiling proceed to Installing the AP 120 MNT CV on a Ceiling on page 5 The AP 120 MNT CV kit includes the following z 1x Plastic base which attaches to the AP z 1x Plastic cover which hides the AP s ports z 1x Plastic outlet mounting plate z 1x 9 16 ceiling tile adapter z 1x 15 16 ceiling tile adapter Additional Tools z A screwdriver that matches the screws ...

Page 2: ...d junction box Figure 1 Save the screws Figure 1 Removing the installed cover plate b Identify the Ethernet cable or cables that will be connected to the AP 121 or AP 125 The Ethernet cable must have a male RJ 45 connector c Attach the mounting plate to the junction box using the screws from the removed cover plate Figure 2 Figure 2 Installing the mounting plate AP120_001 ...

Page 3: ...own and out of the way 3 Place the AP into the base Figure 3 Place the top AP into the hooks on the base and align the back of the AP with the large opening in the base Figure 3 AP installed in the base 4 Connect the ethernet cable or cables to the AP Figure 4 Ensure that the cables do not obstruct any of the connection points between the base and the cover Figure 4 Cable path AP120_003 AP120_005 ...

Page 4: ...ward until the pegs engage the slots at the top of the mounting holes c Optional Extend right and left antennas vertically before installing the cover d Once the AP is securely attached to mounting plate install the cover by placing the hooks on the cover into the holes on the bottom of the base Push the top of the cover towards to base until it clicks into places Figure 5 Completing the installat...

Page 5: ...on a ceiling rail 1 Place the AP into the base Figure 7 Place the top AP into the hooks on the base and align the back of the AP with the large opening in the base Figure 7 AP Installed in base 2 Install the ceiling rail adapter that matches your ceiling rails Figure 8 Figure 8 Installing the AP ceiling rail adapter 3 AP120_007 ...

Page 6: ... Ensure that the cables do not obstruct any of the connection points between the base and the cover Figure 9 Cable path 5 Hold the enclosure base next to the ceiling rail with the ceiling rail at approximately a 30 degree angle to the ceiling tile rail Figure 10 6 Rotate the enclosure base clockwise until the device clicks into place on the ceiling rail Figure 10 Installing the AP on a ceiling rai...

Page 7: ...end The access is shown in Figure 11 8 Once the AP is secured to the ceiling rail install the cover by placing the hooks on the cover into the holes on the bottom of the base Figure 11 Push the top of the cover towards to base until it clicks into places Figure 11 Installing the cover Figure 12 Completed ceiling installation AP120_002 Access cutout ...

Page 8: ...8 July 2010 0510596 02 2010 Aruba Networks Inc All rights reserved ...