ARTEX PRODUCTS / ACR ELECTRONICS, INC.
DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL
ELT 1000 (P/N: A3-06-2749-1)
Y1-03-0259 Rev. U
Company Confidential
Page 56 of 62
Figure 28 Battery Pack Installation
3)
Verify the gasket is in place and in good condition. Note that the gasket fits only one way in the groove.
4)
Lay the battery pack on the work surface with the cells facing up.
5)
Align the ELT with the battery pack, holding it slightly above the pack with one hand.
6)
Connect the ELT flex cable receptacle to the plug on the battery pack circuit board using the other hand, taking
care not to put a twist in the flex cable.
NOTE:
The receptacle should “click” into place when properly mated to the plug. If the ELT activates
when power is connected, reset by toggling the ELT local control switch to “ON” and back to
“ARM” after 1-2 seconds.
7)
Fit the battery pack into place on the ELT, making sure the gasket is positioned correctly.
8)
Turn the battery pack and ELT over to install the screws, while securely holding the ELT and battery pack
together.
9)
Install the eight battery pack retaining screws and tighten until the ELT is snug against the gasket.
10)
Torque the screws to 10-12 lb-in (113-136 N•cm).
11)
Perform a self-test to verify operation.