33
Measure the building diagonally again to make
sure the building is square. The building should
be square at the base and at the top. This will
make roof panels fi t better and holes will better
align.
If a Roof Strengthening Kit was purchased,
assemble and install before attaching Roof
Panels.
Whenever a crimped rib and an uncrimped rib meet,
place the crimped rib UNDER the uncrimped rib.
Crimped Rib
Uncrimped Rib
Be sure to carefully follow the Roof Panel
Placement Order Diagram on this page.
9086
7743
10553
7743
9087
9087
7743
10927
7743
9086
12
8
7
4
2
11
6
5
3
1
FRONT
Roof Panel Placement Order
If Roof Beam holes do not line up with Roof
Panel holes, shift the building from left to right. If
this does not help, your building may not be level.
Shim the corners until holes line up.
Roof Install Prep Page
Use the information on this page to complete steps 13 thru 14.
The building is square when diagonal measurements are equal.
33AZ
9
10
10553
10927
Summary of Contents for VAR1012S
Page 46: ...ASSEMBLY NOTES 46A 46...
Page 47: ...ASSEMBLY NOTES 46A 47...
Page 48: ...ASSEMBLY NOTES 46A 48...