42
Assemblies from Step 16:
• Right Door Assembly (1)
• Left Door Assembly (1)
Closed Position
Half-Open Position
(QTY: 8)
INSIDE BUILDING
Front Floor Frame
Door
Door Slide
Door Track
Gable
From inside the building, place the bottom
of the
Door
into the
Front Floor Frame
track at about the half-open position.
1
Rotate the
Door
forward until it is vertical
and align the
Door Slides
with the
Door
.
2
Insert two (2) black screws into each
Door
Slide
as shown below. Repeat steps for
second
Door
.
3
If Doors do not align, raise or lower one side of the Door by placing
the Door screws through a different set of holes in the Door Slide.
Door Adjustment
You will need for this page:
Step 16: Door Install
41AW
Summary of Contents for VAR1012S
Page 46: ...ASSEMBLY NOTES 46A 46...
Page 47: ...ASSEMBLY NOTES 46A 47...
Page 48: ...ASSEMBLY NOTES 46A 48...