38
You will need for this page:
Step 13: Continued
(QTY: 72)
(QTY: 18)
38AZ
9086
Right Roof
Panel
1
9087
Left Roof
Panel
1
Roof Panel
2
7743
Ridge Cap
1
6869
Back
Front
7743
7743
9087
9086
6869
Continue to apply weather stripping.
Attach
Roof Panels,
one at a time,
to
Roof Beams
using eight (8) screws
per
Panel
.
Insert bolt
and nut
in middle hole where ribs overlap.
16
DO NOT secure end of Ridge Caps
until Peak Caps are in place.
DO NOT fully tighten Ridge Cap bolts
until you have both Ridge Cap bolts in
place. This will ease assembly. Bolts must be fully
tightened before moving on to the next page.
Attach
Front Left
and
Right Roof Panels,
one at a time,
to
Roof Beams
using
eight (8) screws
per
Panel.
Insert bolt
and nut
in middle hole where ribs overlap.
17
Secure
Front Roof Panels
to
Gables
using fi ve (5) bolts
and nuts
per
Gable
.
18
Attach
Long Ridge Cap
with four (4) bolts and nuts. DO NOT secure end of
Ridge
Caps
until
Peak Caps
are in place.
20
Finish
Weather Stripping
the
Roof
and cut the tape just past the end of the
Roof
.
Fold end of tape under roof edge.
19
On both sides of the building, secure the bottom of
Roof Panels
to the
Side Wall
Angles
using four (4) screws per
Panel
.
21
39
Roof Trim Caps are positioned as shown.
You will need for this page:
Step 14: Roof Trim
Slide
Peak Cap
legs under
Ridge Cap
and
secure with two (2) bolts and nuts on each
end.
1
3
Position the
Roof Trim Caps
as shown
below and secure with a screw.
2
Position
Roof Trim
as shown below and
secure with screws. Do not fasten the last
screw on each
Corner
.
Trim Cap (L)
2
Trim Cap (R)
2
Peak Cap
2
(QTY: 8)
(QTY: 4)
Roof Trim
4
6015
Roof Trim
2
6014
(QTY: 4)
39AZ
6015
6015
6015
6015
6014
6014
Summary of Contents for VAR1012S
Page 46: ...ASSEMBLY NOTES 46A 46...
Page 47: ...ASSEMBLY NOTES 46A 47...
Page 48: ...ASSEMBLY NOTES 46A 48...