Before beginning construction, check local building codes regarding footings, location and 

other requirements. Study and understand this owner's manual.  Important information and 

helpful tips will make your construction easier and more enjoyable.

Assembly Instructions:

 Instructions are supplied in this manual and contain all 

appropriate information for your building model. Review all instructions before you begin, 

and during assembly, follow the step sequence carefully for successful results.

Flooring and Anchoring:

 Your storage building must be anchored to prevent wind 

damage. A base is necessary to construct a square and level building. Anchoring and base 

materials are not included with your building. Your assembly instructions provide information 

on a few methods commonly used to secure and level a storage building.

Parts and Parts List:

 Check to be sure that you have all the necessary parts for your 

building.

 

•All part numbers can be found on the parts. All of these numbers (before the -) must agree with  

 

the numbers on the Parts List page.

 

•If you fi nd that a part is missing, include the model number of your building  

 

and contact the retailer where you purchased your shed. 

 

 

 

•Separate contents of the carton by the part number while reviewing parts list.  The fi rst few    

 

steps show how to join related parts to make larger sub assemblies which will be used later.

 

•Familiarize yourself with the hardware and fasteners for easier use during construction. 

 

These are packaged within the carton. Note that extra fasteners have been supplied 

 

for your convenience.

 

BEFORE YOU BEGIN....

    XA02

Summary of Contents for EPA84

Page 1: ...WHEN HANDLING METAL PARTS 716440616 Model No EPA84 Owner s Manual Assembly Instructions YL01 Storage Area 28 Sq Ft 150 Cu Ft 2 6 m2 4 2 m3 Exterior Dimensions Interior Dimensions Door Approx Base Roo...

Page 2: ......

Page 3: ...aterialsarenotincludedwithyourbuilding Yourassemblyinstructionsprovideinformation on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you h...

Page 4: ...k Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Ma...

Page 5: ...r concentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite...

Page 6: ...y Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather in ltration and to protect the metal from being scratched by screws Regularly check...

Page 7: ...e slab should be at least 4 10 2 cm thick It must be level and at to provide good support for the frame The following are the recommended materials for your base 1 x 4 s 19 mm x 89 mm will be removed...

Page 8: ...ring XA07 Anchoring into Concrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 6...

Page 9: ...Guide 4 66183 Roof Trim Cap 2 right 2 left 66045 Handle 2 66646 Washer 235 6 sheets of 40 65109 8 32 Acorn Nut 6 Packed with Screws 65004 8Ax5 16 8 mm Screw 234 65923 8 32x3 8 10 mm Bolt 62 65900A 10...

Page 10: ...9 10560 Right Roof Panel 1 10 80013 Left Roof Panel 1 11 10570 Roof Beam 2 12 10564 Side Wall Angle 2 13 10545 Side Wall Channel 2 14 80017 Left Roof Trim 2 15 8941 Ramp 1 16 10544 Side Floor Frame 2...

Page 11: ...10 Assembly by Key No YL10 27 4 4 10 9 8 8 14 14 6 7 11 11 5 5 5 26 22 22 27 20 20 1 1 12 17 17 17 24 24 12 26 21 21 19 19 18 18 16 16 23 23 25 25 15 3 3 3 3 2 13 13 17...

Page 12: ...or frames as shown The holes in these pieces will align when the pieces are positioned with correct amount of overlap See the illustrations below for the proper overall length of the rear oor frame Jo...

Page 13: ...eces as shown in the gure and fasten the two pieces together with one bolt in the center hole ve holes will align 2Overlaptherearwallanglepieces as shown in the gure and fasten them together with one...

Page 14: ...Place the end of one roof beam inside a second roof beam so that the six holes in each piece align Do not insert bolts yet 2 Fasten the pressed together roof beam with eight bolts 3 Double check the...

Page 15: ...wall It is made up of ve pieces 1 Using the door track splice painted join the door track galvanized pieces end to end as shown 2 Insert four screws from the under side only 3 Using this door track a...

Page 16: ...front corners fasten bolts through from the bottom with nuts on top 2Measurethe oorframediagonally When the diagonal measurements are equal the oor frame is square NOTE If using a wood platform or con...

Page 17: ...position as shown NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to complete the assembly tod...

Page 18: ...f the rear wall using screws NOTE The upper leg of the side wall angles must face the outside of the building 3Fastenthesidewallanglesacross the inside top of the side panels us ing screws 4 Fasten th...

Page 19: ...ve the cor rect panels in each position Do this by overlapping the panels and determining if the holes line up with the holes in the frame Panels rest on frame as shown 2 STEP 1 6243 STEP Crimped Rib...

Page 20: ...wn Push a plug into hole at center of jamb closest to door opening 2 Fasten the top of the door jamb to the door track with two screws Do the same for the bottom into frame Repeatsteps1and2fortheoppos...

Page 21: ...sembly 1 1 The dimension stated below mea sures from the end of the angle to wardsthefrontofthebuilding Fasten the roof beam assembly small holes on top to the side wall angle with a bolt and nut 1 ST...

Page 22: ...E Measure the building diagonally again and make adjustments to make sure the building is square and level This will make the roof panels t better and holes will align 1 Locate the roof panels and nd...

Page 23: ...n the positions shown Fasten middle of rib overlap with a bolt and nut NOTE Narrow roof panel crimped rib is overlapped by wide rib of adjacent panel where possible 1 STEP 10557 Roof Panel FRONT 36 4...

Page 24: ...etween the leg of the side wall angleandtopedgeofthewallpanels NOTE The front leg of the gable must be positioned inside of the front header 1 STEP Gable 10 6 2 Fasten to the right roof panel side wal...

Page 25: ...rews at each roof panel overlap NOTE A single screw fastens both trim pieces at the overlap 2Usingyourthumbandindex nger overbendthebottom angeoftheroof trim at the corner inward enough so the right a...

Page 26: ...al door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace in place Fasten to door above and below center connection using 2 screws 3 Put a...

Page 27: ...or slides 3 Fasten the door to the door slides usingtwo 10Bx1 2 13mm screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repeat s...

Page 28: ...d nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to protecting against weather in ltration the washers protect the metal from being scraped by the sc...