It is important that the entire fl oor frame be anchored after the building is erected.

 

Below are recommended ways of anchoring. 

 

Anchoring Down The Building

Anchoring

A10

Arrow Anchoring Kit:

 

(Model No. AK100 or 68383)

Recommended for use with the concrete base.

Contains: Corner gussets, perimeter clips, hardware,

1/4" masonary drill bit and installation instruction.

Anchoring into Concrete:

1. For poured concrete slab or footing or patio blocks:

Use 1/4" x 2" (6 mm x 51 mm) Lag Screws.

2. For Anchor Post of Concrete poured after building is

erected: Use 1/4" x 6" (6 mm x 152 mm) Lag Screws.

Arrow Anchoring Kit:

 

(Model No. AK4 or 60298)

Recommended for use with any suggested base.

Contains: 4 Anchors with Cable, Clamps and

installation instruction.

Anchoring into Wood/Post:

Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) 

dia. holes provided in the frames for proper anchoring.

OVER THE BEAMS

AND INTO THE GROUND

1.

2.

1.

2.

10

Summary of Contents for BW54-A

Page 1: ...151 1 cm 121 9 cm 179 7 cm 137 8 cm 109 5 cm 176 5 cm 56 5 cm 165 1 cm Storage Area 16 Sq Ft 93 Cu Ft 1 5 m2 2 6 m3 BUILDING DIMENSIONS Size rounded off to the nearest foot CAUTION SOME PARTS HAVE SH...

Page 2: ......

Page 3: ...s website arrowsheds com or call Arrow s Customer Service department 1 800 851 1085 or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a...

Page 4: ...k Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Ma...

Page 5: ...weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions an...

Page 6: ...hat prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to pro...

Page 7: ...to a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus five heavy d...

Page 8: ...Accessories SPECIAL NOTE If your accessory is shipped via truck line a day time phone number is required to arrange delivery If no one is available to sign for the delivery you may be subject to a re...

Page 9: ...To construct the base follow instructions and diagram Construct frame using 10 penny galvanized nails Measure 16 24 40 6 cm 61 0 cm sections to construct inside frame see diagram Secure plywood to fr...

Page 10: ...nstruction Anchoring into Concrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6...

Page 11: ...Corner Cap 2 66260 Handle 1 66646 Washer 137 4 sheets of 40 65109 8 32 Acorn Nut 3 Packed with Screws 66098 Plastic Spacer 2 Packed with Screws 65004 8Ax5 16 8 mm Screw 121 65923 8 32x3 8 10 mm Bolt...

Page 12: ...or Brace 2 7 10473 Door 1 8 7461 Rear Wall Angle 1 9 7464 Right Roof Panel 1 10 7465 Left Roof Panel 1 11 7532 Right Gable 1 12 7533 Left Gable 1 13 7534 Roof Trim 2 14 7660 Roof Beam 1 15 7661 Header...

Page 13: ...Assembly by Key No BI13 13...

Page 14: ...pieces 1 Using the door track with small holes on top join the header short leg on top as shown using screws 2 Position door slides onto the legs from the end of door track as shown in the end view 3...

Page 15: ...ing a wood platform or concrete slab do not fasten the floor frames to your base at this time You will anchor the building after it is erected Step 2 BI15 Parts Needed For Floor Frame 9458 Front Floor...

Page 16: ...own 3 Double check the part numbers of the corner wall panels before proceeding The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if...

Page 17: ...gables which support the roof 1 Fasten the rear wall angle across the top of the rear wall using screws 2 Fasten the rear wall channel across the middle of the rear wall using screws 3 Fasten the side...

Page 18: ...ht corner panel with a bolt and nut Fasten the top of the jamb to the door track with a 7 8 22 mm screw and a plastic spacer as shown Do the same for the bottom 4 Fasten a left door jamb to the front...

Page 19: ...and left gable overlapping header in front to the right and left hand wall with screws Join gables to header in the front corners using a bolt and nut 2 Bend tab at each end of roof beam upward Positi...

Page 20: ...s and place them on the ground alongside the building in their proper positions 2 Position a right roof panel at the right side and fasten to the gable and header using screws and bolts as shown Do no...

Page 21: ...bend the bottom flange of the roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the roof trim using a screw 4 Fa...

Page 22: ...sert a screw 3 Hold the vertical door brace against the center of the inside surface of the door and turn the screw to hold the vertical door brace and door handle brace in place Fasten to door above...

Page 23: ...the door to the door slides using two 10Bx1 2 13 mm screws per door slide NOTE The holes in the door slides allow you to adjust the door Place the door in the middle holes 4 Attach door handle lock br...

Page 24: ...washers supplied In addition to protecting against weather infiltration the washers protect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and lea...

Reviews: