Instructions for opening the housing and checking the
inside of the boiler
In order to have access inside the boiler it is necessary to:
2. unscrew the two screws on the front panel (b), pull it forward and
detach it from the top hooks (c -d).
Before carrying out any operation on the boiler, disconnect it from the
power supply by closing the external bipolar switch and the gas valve.
1. remove the crankcase by removing it from the housing (a);
24 /
(b)
(c)
(a)
(d)
MAINTENANCE
Machine Translated by Google