- check the earthing efficiency.
Proceed as follows:
Filling the installation with water
- check if the type of gas supplied corresponds to the one indicated on
the stamp plate of the boiler;
- open doors and windows;
Proceed as follows:
- open the tap on the flow circuit (cold water supply);
- avoid sparks and open flames;
In order to guarantee the safety and proper operation of the plant,
commissioning must be carried out by a qualified technician who is
authorized by law to do so.
- remove the automatic vent valve cover from the pump
- check the tightness of the fuel system with the boiler shut-off valve
closed and then open, and the gas valve closed (deactivated) for
10 minutes the meter (gas sensor) must not indicate any gas
passage.
Power supply
circulation;
- Check that the supply voltage and frequency match yes
- gradually open the filling valve and close the ventilation valves
on the radiators as soon as the water comes out
- close the boiler filling valve when the pressure indicated on the
hydrometer is 1 bar.
tele inscribed on the stamp plate of the power plant;
Gas supply
PUTTING INTO SERVICE
1
16 /
The performance of certain functions is also indicated:
NB: If the boiler is not used for a long time, the siphon
must be refilled before starting the boiler. The siphon
acts as a hydraulic barrier, and it is dangerous to start
the boiler without water in the siphon, because the
flue gases can be released into the room.
- activate the deaeration cycle by pressing the 1 key for
10 seconds. The plant will begin a deaeration cycle of
approximately 7 minutes.
1. Make sure that:
Pressing key 1 for 10 seconds will
start the boiler cycle which will last
approximately 7 minutes.
- the flue pipe must be e
Eliminate any gas leaks.
- the electrical connection is made correctly.
- make sure that all vents / windows in the room are open
(type B installation).
operation (heating or domestic hot water).
a - the mode of operation set with the symbols and b - the
numbers show:
Ignition procedure
yellow is connected to a good earthing system;
must be refilled.
- in the sanitary circuit mode, the set temperature of the domestic
horse water
Preparation for commissioning
the installation,
on the pressure gauge, is higher
than 1 bar; - start the boiler (by
pressing the On / Off key) and
select the standby mode, there
are no demands, neither from
the household circuit nor from
the heating circuit.
First start
3. Open the gas valve and check the tightness of the
connections, including those of the boiler, checking that
the measuring device does not signal any gas passage.
- at the end of it, check that there is no more air in the
installation; otherwise, repeat the operation;
- ventilate the radiators;
- the gas valve is closed;
Ventilation function
4. Start the boiler by selecting with Key 1
2. Check that the siphon contains water. If not, check it
In any case, make sure that the ground wire is green /
Burner ignites: If this does not happen on the first try,
repeat the operation until it ignites.
adequate and without any obstacles
The function can be interrupted by
pressing the 1 key again . If
necessary, you can activate a new
cycle. Check that the boiler is also in Standby mode
(no request from the heating or sanitary circuit).
Press the ON / OFF key on the control panel to turn on the
boiler:
- in heating mode, flow temperature
- lift the automatic overpressure
valve plug with a screwdriver;
Deaeration cycle started
Post-circulation heating
Post-circulation domestic hot water
Machine Translated by Google