SECTION 3. INSTALLATION
3.1 INTRODUCTION
As with any sophisticated communications device, installation of the ARIA-130 System requires the care
and forethought of a competent technician. Installation proceeds in 5 major steps;
−
Site Preparation
−
KSU Installation
−
PCB Installation
−
System Wiring
−
System Programming and Verification
By utilizing the instructions that follow, the installation is quick and efficient. Directions for System
Programming are briefly given in
SECTION 6. CUSTOMER DATABASE PROGRAMMING
.
3.2 SITE PREPARATION
3.2.1 General Site Consideration
The first step is to locate an acceptable site for the common equipment (KSUs, boards, etc.). When
locating a mounting site for the KSUs, the following points must be considered;
a)
The KSUs are designed for wall mounting and should not be mounted directly to a masonry or
plaster- board wall. It is recommended that a 1/2 plywood backboard be firmly mounted to the
wall. After that, the KSU and the MDF are mounted to the backboard.
b)
The location must have access to a dedicated 110 Volt AC or 220 Volt AC, 50-60 Hz circuit with a
circuit breaker or fuse rated at 15 amps. A 3-wire parallel blade grounded outlet should be within
approximately 2 meters (6 feet) of the lower left rear of the KSU mounting.
c)
The location must have access to a good earth ground, such as a metallic cold water pipe with no
non-metallic joints. The ground source should be located as close as possible to the system.
d)
The system should be located in an area which is well ventilated with a recommended
temperature of 20-26 degrees C (68-78.8 degrees F) and a relative humidity of 5-90 % (non-
condensing).
e)
The system should be located within 8 meters (25 feet) of the telephone company's termination