Argo AT0623 Installation, Operation & Maintenance Manual Download Page 3

3

!

  

WARNING

Installation of boiler should be done only 

by qualified expert and in accordance with 

appropriate installation manual. Installing 

boiler or any other electric appliance with 

improper methods or materials may result in 

serious injury or death due to fire.

WArnings

inTroducTion

Manual is intended to familiarize installer and user of 

Electric Hydronic Block with its installation, operation 

and maintenance to assure its normal trouble free 

operation.

Argo electric boilers are designed and manufactured 

with quality components for maximum life, durability 

and minimum service. Follow installation instructions 

carefully before operating heating system for 

optimum efficiency and satisfaction. Failure to do so 

may result in breach of warranty.

producT dEscripTion

Electric Hydronic Block is heating device converts 

electrical energy to heat energy through medium 

of water. Simplified theory of this conversion is as 

follows:

Electrical Energy x Conversion Factor = Energy

– Or –

Kilowatts Of Electricity Used Per Hour x 3412 = 

British Thermal Units (Btuh) Available Per Hour For 

Heating.

Information is basis used to establish Electric 

Hydronic Block ratings (See Table 1 on page 4). Since 

conversion process requires no combustion, boiler 

operates with highest possible efficiency.

Electric Hydronic Block is constructed with cast 

iron boiler that conforms to American Society of 

Mechanical Engineers (ASME) Boiler & Pressure 

Vessel Code. Interior design allows just enough 

water to be present for proper heating element 

operation - no excess water is stored which would 

cause undesirable thermal losses and longer recovery 

times.

Control system is assembled in modular package 

keeping overall size and weight of Electric Hydronic 

Block to minimum. Construction of entire Electric 

Hydronic Block conforms to Canadian Standards 

Association (CSA) Standards for Safety for Electric 
Boilers.
Following important product information is located on 

cabinet cover:

• Model Number   

 

• Manufacturer's Serial Number

• BTU Rating

• Heating Element Ratings

• Water Pressure & Temperature Limits

• CSA Listing

• ASME Stamp

• Total Amps

• Clearance

insTALLATion mAnuAL And opErATing insTrucTions

Argo Electric Boilers are controlled by electronic 

control board maintaining water temperature. Control 

cycles heating elements based on heating demand, 

and preset boiler outlet water temperature. Control 

also operates 120Vac circulating pump rated up 

to 5A. When thermostat calls for heat, control will 

operate boiler to regulate water temperature at pre-

selected set point. System pump is on whenever 
thermostat calling for heat.

Summary of Contents for AT0623

Page 1: ...n and specifications outlined in this manual in effect at the time of printing of this manual ECR International reserves the right to discontinue change specifications or system design at any time wit...

Page 2: ...NUAL NEAR BOILER RETAIN FOR FUTURE REFERENCE NOTICE Owner Installation and service of this boiler must be performed by qualified installer Installer Leave all instructions with the boiler for future r...

Page 3: ...nversion process requires no combustion boiler operates with highest possible efficiency Electric Hydronic Block is constructed with cast iron boiler that conforms to American Society of Mechanical En...

Page 4: ...t Boiler Recommended Wire AT0623 6 208 4 507 15 400 21 7 3 000 2 6 27 7 34 6 35 0 8 10 10 AT0824 8 208 6 009 20 500 28 9 4 000 2 6 34 9 43 6 45 0 6 8 8 AT1025 10 208 7 511 25 600 36 1 5 000 2 6 42 1 5...

Page 5: ...ting brackets for easy wall mounting Use of lag screws or anchor bolts through holes provided or on 3 4 plywood panel On uneven walls suggested mounting surface be provided such as two 2 x 4 s Surface...

Page 6: ...p supply may be located in this area below Circulator pump should be installed on supply side pumping away 6 Install gate valves at locations shown in Figures 2 3 so any boiler servicing requiring rem...

Page 7: ...7 primary secondary piping for Multiple zoning with ZONE VALVES primary secondary piping for Multiple zoning with circulators PRIMary secondary piping figure 2 figure 3...

Page 8: ...e ends before inserting into terminal block Tighten terminal screws Do not use pump rated greater than 5 amps Thermostat Connect thermostat or zone valve end switch to terminals TT and TT Figure 4 Do...

Page 9: ...re sizes specified conform to Canadian Electrical Code Canada or National Electric Code USA and include derating for ampacity and temperature Use copper wire only Check state and local requirements Re...

Page 10: ...or will continue to be energized for 3 minutes to purge boiler After 3 minutes control will de energize circulator Circ LED turns off If during start up or during operation safety end switch opens its...

Page 11: ...TACT SEC 120 VOLT WIRING POSE DES C BLES 120 VOLT 240 VOLT WIRING POSE DES C BLES 240 VOLT 120 VOLT FIELD WIRING POSE DES C BLES 120 VOLT SUR EN CHANTIER 240 VOLT FIELD WIRING POSE DES C BLES 240 VOLT...

Page 12: ...HERS SOURCE DU COURANT 120V 60HZ 1PH OU AUTRES OPTIONAL FLOW SWITCH BY OTHERS INTERRUPTEUR DE D BIT FACULTATIF OU AUTRES THERMOSTAT BY OTHERS THERMOSTAT OU AUTRES ELEMENT 1 L MENT No1 ELEMENT 1 RELAYS...

Page 13: ...T BLK BLANC NOIR WHT BLANC FUSE BLOCK BLOC DE FUSIBLE BLK NOIR L2 L1 POWER BLOCK BLOC DE PUISSANCE 240 VOLT FIELD WIRING POSE DES C BLES 240 VOLT EN CHANTIER EN CHANTIER 120 VOLT WIRING POSE DES C BLE...

Page 14: ...NOIR WHT BLANC RED ROUGE WIRE LEGEND L GENDE DES FILS DRY CONTACT WIRING POSE DES C BLES DE CONTACT SEC 120 VOLT WIRING POSE DES C BLES 120 VOLT 240 VOLT WIRING POSE DES C BLES 240 VOLT 120 VOLT FIELD...

Page 15: ...as the pressure remains less than 25 PSIG Hydronic block is now ready to be put into service Verify hydronic block circuit breaker or switch at service 1 entrance and depending on option hydronic blo...

Page 16: ...cluded with this manual Turn off hydronic unit circuit breaker at service en 1 trance and or disconnect switch Close gate valves near inlet and outlet of hydronic 2 block noisy boiler heating element...

Page 17: ...rly routed to suitable container or drain Manually operate pressure relief valve by pulling lever at end of valve until lever is in line with center line of valve Figure 9 Close valve to avoid losing...

Page 18: ...erature Pressure Gauge C57 Pressure Vessel Cast Iron 2 Element Z302A Control Panel Assembly 2 Element Complete 2 Element Electric Boiler w Power Block Item Part Number Description 1 S47 Safety Limit C...

Page 19: ...t Z304A Control Panel Assembly 4 Element Complete 4 Element Electric Boiler w Power Block Item Part Number Description 1 S47 Safety Limit Control High Limit Fixed Temp 2 G12 Gasket Heating Element 3 E...

Page 20: ...LATOR PUMP 120 VAC PRIMARY TT TT C1 C2 SINGLE ZONE WITH CIRCULATOR 2 BOILERS ONE SINGLE ZONE NOTE ABOVE NUMBERS REFER TO NUMBER DESIGNATIONS ON RELAY BASE 9 13 14 12 5 1 RELAY RELAY BASE 4 8 DIN RAIL...

Page 21: ...O ZONES WITH CIRCULATORS 2 BOILERS NOTE IF CONTROL ONLY CONTAINS ONE ISOLATED END SWITCH PLEASE CONTACT TECHNICAL SERVICE FOR PROPER INSTALLATION AT BOILER CIR CIRCULATOR PUMP 120 VAC PRIMARY TT TT C1...

Page 22: ...ONE VALVE ZONE VALVE ZONE VALVE THERMOSTATS THREE ZONES WITH CONTROL VALVES AT BOILER C1 C2 CIR CIRCULATOR PUMP 120 VAC TT TT PRIMARY X X ZONE 1 ZONE 2 TR TW SWITCH ISOLATED THERMOSTAT SPST 2 WIRE ARG...

Page 23: ...6 7 7 8 2 2 42 2 2 6 6 02 3352 4 0 2 452 5 02 3352 2 6 6 0 0 4 7 4 2 2 05 0 6 6 7 7 8 7 3500 9 2 6 6 6 6 80 3 4 2 3 0 2 4 2 54 4 2 6 4 7 7 7 7 6 6 6 6 6 6 6 6 4 4 7 6 6 6 6 4 5 2 2 0 0 2 5 4 2 05 0 6...

Page 24: ...LED should come on with the jumper installed OK OK Lights come on with jumper and elements then energize Replace circuit breaker or power block depending on type of boiler Check service at main load...

Page 25: ...ler and the output of all boiler circuit breakers 240vac not present 240vac present Replace circuit breakers Yes No Is there an increase in temperature 240vac not present Verify that 240vac is pres en...

Page 26: ...audible alarm flashing pulsing twice Stuck welded element relay contact Replace electric boiler control board RTD short Follow steps on page 10 to check RTD and replace if necessary RTD open Follow st...

Page 27: ...ry Yes Potentially bad low water cut off Check wiring to LWCO and consult LWCO manufacturer if necessary No Check pump and flow rate of system Pump may require replacement Does visual audible alarm sh...

Page 28: ...______________________________ ___________________________________________________________ Telephone Number ___________________________________________ After Hours Number _____________________________...

Reviews: