RE. ENR.110 - Rév B – le 15/03/2014
page : 9
- Operations on the previous page are identical then :
- Set up the connectors of the pressure generator :
•
G1/2 provided with o-ring (aluminium, copper or two-component) for maximum operating
pressure 1250 bars.
•
Connect directly to the output M16x150 for pressure > 1250 bar
> Dirty or polluted gauges must be cleaned
before mounting the pressure generator to
prevent contamination on the hydraulic
circuit. Don't clean the tank with alcohol
Option : cleaning bench (Ref.OP0062)
c) Put into service
> the generators are equipped with
precision valves instrumentation, it is
imperative to observe the following
guidelines to keep your machine in good
working condition.
Filling the device with the fluid
1.
Open valves
5
and turn the capstan
1
in the direction of clockwise until reaching the stop limit
switch forward.
2.
Remove the filler cap on the tank
3.
Fill the tank with the correct fluid. Use the supplied oil. Don't use other liquids.
> Our devices are mounted and designed to
a standard use. They function with the
fluid provided. Some fluids such skydrol,
castor oil etc... are corrosive and can
damage the o-ring of your device.
On request : we can deliver a device
designed for these fluids.
4.
Turn the capstan completely in the opposite direction of clockwise until it reaches the stop.
5.
If necessary replenish the tank.
Purging the device
1.
Open the valves
5
and turn the capstan
1
in the direction of clockwise until reaching the stop
limit switch forward
- Maximum torque applicable abutment valve open = 0,3 Nm
- Maximum torque applicable abutment valve closed = 4 Nm.
When the abutment valve open is reached, turn the wheel valve 1/4 turn clockwise.
2.
Unscrew the filler cap
7
and fill the 3/4 tank with oil(Model CH1 or CH2) or demineralized
water (model CO) according the pressure generator mode. Replace the cap
7
.
Put on the connectors : the reference instrument and the gauge to be tested.
3.
Turn the capstan
1
in the opposite direction clockwise until reaching the stop end position.