1. Inject the desired value of the current pick-up level separately to IL1 and to I0.
2. Start from the maximum setting and slowly adjust the potentiometer by turning it
counterclockwise with a screwdriver.
3. The LED of the corresponding current measurement channel is lit steadily when the
activation with injected current has occurred.
NO
NOTE!
TE!
The measurement channels IL1, IL2 and IL3 have a common adjustment potentiometer "I>
set". It is therefore no
nott necessary to commission the three current measurement channels
separately. Alternatively, the current measurement channels IL1, IL2 and IL3 can be injected
with the same current in serial connection. After a successful commissioning the device has
to be installed again according to the instructions in Chapter 6.1.3 ("SET button").
7.3 Light channel activation
Light channels are commissioned by applying a strong light to the light sensor's detector area. For arc
light simulation use a superior camera flash. For testing non-latched signals and the CBFP function use
a strong flashlight. Make sure that the camera flash or flashlight has a fully charged battery when
testing.
The same procedure applies to fiber sensors as well.
1. Apply light to the light sensor's detection area.
2. The LED of the corresponding light sensor channel lights steadily when the sensor has
detected the light.
Figure. 7.3 - 22. Light channel activation.