7 Commissioning of arc flash relays
7.1 System installation
When all the connections are done, the system is commissioned by installing the devices one by one.
Depending on the Installation is done by pressing the SET button according to the instruction in
Chapter 6.1.3 ("SET button").
7.2 Current measurement
NO
NOTE!
TE!
Current measurement is applicable onl
onlyy to AQ-110P)!
Current measurement channels should be adjusted to the pick-up setting value according to the
following procedure.
Figure. 7.2 - 21. Procedure for current measurement commissioning.