
Y-LED Upgrade Kit Installation Guide
Fixture: FGL - Federal Globe Large Scale (FGL) - For SLG/PA3/PA5 Lens
A R C H I T E C T U R A L A R E A L I G H T I N G
93049778 REV. A
PAGE 3/5
www.aal.net
16555 East Gale Avenue
City of Industry, CA 91745
626.968.5666
2.
REMOVE EXISTING BALLAST ASSEMBLY
AND SOCKET ASSEMBLY
1. TILT CAST LID TO THE SIDE BY PULLING
LATCH BACKWARD. (FIG. 2-1)
2. DISENGAGE QUICK-DISCONNECT AND
PULL APART. (FIG. 2-1)
3. REMOVE SOCKET ASSEMBLY BY
TURNING TURN-LATCH COUNTER
CLOCKWISE. (FIG. 2-2)
4. REMOVE BALLAST ASSEMBLY. (FIG. 2-3)
FIG. 2-1
FIG. 2-3
FIG. 2-2
CAST LID
LATCH
CAST BALLAST
HOUSING
QUICK-
DISCONNECT
TURN-LATCH
SOCKET
ASSEMBLY
BALLAST
ASSEMBLY