![Arca Caldaie ASPIRO DUO TECH Installation Operation & Maintenance Download Page 4](http://html1.mh-extra.com/html/arca-caldaie/aspiro-duo-tech/aspiro-duo-tech_installation-operation-and-maintenance_2963444004.webp)
4
INDEX
1. GENERAL
PRESCRIPTIONS.....................................................................................................................6
2. TECHNICAL
CHARACTERISTICS AND OVERALL DIMENSIONS ............................................................7
2.1. BOILER ...................................................................................................................................................................7
2.2. ARCHIMEDEAN SCREW .......................................................................................................................................8
2.3. FUEL TANK ............................................................................................................................................................8
3. MAIN
BOILER COMPONENTS...................................................................................................................9
3.1. WOOD
CHARGING BOX........................................................................................................................................9
3.2.
MAIN BURNER REFRACTORY CEMENT FRAME AND CAST IRON BARS.........................................................9
3.3.
HEAT EXCHANGE AREA AND THERMAL CATALYST ELEMENT .......................................................................9
3.4.
SMOKE DRAFTING PASS-THROUGH BOX AND FAN .........................................................................................9
3.5. AIR
DISTRIBUTION SUBASSEMBLY ....................................................................................................................9
3.6.
HOT SANITARY WATER HEAT EXCHANGER.................................................................................................... 10
3.7. EMERGENCY
HEAT EXCHANGER ..................................................................................................................... 10
3.8. WATER
TEMPERATURE
SENSORS MOUNTING CASES ................................................................................. 10
3.9.
BYPASS PUMP (ANTICONDENSATION) ............................................................................................................ 10
3.10. INSULATION......................................................................................................................................................... 10
3.11. CIRCUIT
FILLING WATER ................................................................................................................................... 10
3.12. CIRCUIT
FILLING WATER ................................................................................................................................... 11
4. OPERATION MODES ...............................................................................................................................11
4.1. GASIFICATION
TECHNOLOGY (WOOD OPERATION) ...................................................................................... 11
5. INSTALLATION.........................................................................................................................................12
5.1. INSTALLATION
IN THE BOILER ROOM .............................................................................................................. 12
5.2. EXTERNAL
BOILER CASE PACKING ................................................................................................................. 13
5.3. EXTERNAL
BOILER CASE MOUNTING .............................................................................................................. 13
5.4. SYSTEM EXPANSION.......................................................................................................................................... 14
5.5. CHIMNEY.............................................................................................................................................................. 14
5.6. EMERGENCY
HEATSINK RELIEF VALVE CONNECTION ................................................................................. 15
6.
ELECTRONIC CONTROL SY 400 (CODE PEL0100DUO) ......................................................................16
6.1. THE
DISPLAY....................................................................................................................................................... 16
6.2. ELECTRONIC
CONTROL BOARD ....................................................................................................................... 17
6.3. SENSORS CONNECTION.................................................................................................................................... 18
6.4. SMOKE
TEMPERATURE SENSOR CONNECTION ............................................................................................ 18
6.5. TERMINAL STRIP WIRINGS................................................................................................................................ 19
7. OPERATION MODES ...............................................................................................................................21
7.1. WOOD
OPERATION............................................................................................................................................. 21
7.1.1. OPERATION
CYCLE ................................................................................................................................................................24
7.2.
PELLET OPERATION........................................................................................................................................... 25
7.2.1. OPERATION
CYCLE ................................................................................................................................................................26
8. THE
MENUS.............................................................................................................................................27
8.1. BOILER
THERMOSTATIC CONTROL MENU ...................................................................................................... 27
8.2. CUSTOMER MENU .............................................................................................................................................. 27
8.3. SYSTEM
OPERATION
MENU .............................................................................................................................. 29
8.4.
HEATING SYSTEM OPERATION
MENU ............................................................................................................. 30
8.5. TEMPERATURE
SENSORS
READING
MENU .................................................................................................... 31
8.6. CLOCK
MENU....................................................................................................................................................... 33
8.7. CRONOTHERMOSTAT
MENU............................................................................................................................. 33
8.8.
MANUAL AUGER ACTIVATION
MENU................................................................................................................ 40
8.9. TEST
MENU.......................................................................................................................................................... 40
8.10. SUMMER
/
WINTER MENU.................................................................................................................................. 43
Summary of Contents for ASPIRO DUO TECH
Page 2: ...2...
Page 17: ...17 6 2 Electronic board inside the electronic control panel...
Page 62: ...62...