6 Testing & Final Assembly
36
6.4
Post-Installation Check List
Now that the
Air Locker
installation has been completed, ARB
recommends that you take the time to complete the following check list
just to insure that you haven’t missed any of the vital steps.
The air system has been leak tested.
Thread locking compound was used on the ring gear bolts.
All torque settings comply with the ve
hicle manufacturer’s specs
and were set with an accurate torque wrench.
Differential fluid complies with ARB recommendations and has
been filled to the correct level.
All air lines and wiring have been securely cable tied to resist
snagging.
Switch(es) have been securely mounted within operator reach, yet
well away from danger of accidental engagement.
Switch(es) function correctly and illuminate to indicate that
Air
Locker
(s) have been engaged.
The
Air Locker
Warning Sticker has been located within close
proximity of the actuator switch(es).
All operators who are to use the
Air Locker
have read, and fully
understand the
ARB Air Locker Operating & Service Manual.
INSTALLATION PERFORMED BY:
DATE OF INSTALLATION:
ODOMETER READING:
AIR LOCKER SERIAL No.:
___________________________
___________________________
___________________________
___________________________
Summary of Contents for Air Locker RD111
Page 1: ...RD111 TOYOTA 8 IFS 53MM CARRIER BEARING AIR OPERATED LOCKING DIFFERENTIAL INSTALLATION GUIDE ...
Page 4: ...2 ...
Page 39: ...6 Testing Final Assembly 37 ...
Page 40: ......