4 Installing the Air System
28
4.3
Connection to the Bulkhead Fitting
Trim the air line to length using a sharp knife.
Assemble an aluminium washer onto the banjo bolt and insert
through the banjo fitting. Assemble second aluminium washer and
tighten into bulkhead fitting using a 14mm [9/16”] spanner.
(Fig.
Error! Reference source not found.
)
Apply thread sealant to the tapered thread of the compression fitting
body and screw into the banjo fitting. Tighten using a 12mm spanner.
Insert the outer compression nut and ferrule over the air line. Ferrule
should be orientated as per Fig.
Error! Reference source not
found.
Figure 16.
Push the airline into the compression fitting body and screw the outer
nut down onto it. Using a 12mm spanner, tighten the outer nut onto
the compression fitting body.
NOTE : Some force is required to crush the ferrule, however the
outer compression nut will tighten against a stop. Over
tightening will not create a better seal.
Secure any loose sections of tube with a cable tie.
Summary of Contents for Air Locker RD111
Page 1: ...RD111 TOYOTA 8 IFS 53MM CARRIER BEARING AIR OPERATED LOCKING DIFFERENTIAL INSTALLATION GUIDE ...
Page 4: ...2 ...
Page 39: ...6 Testing Final Assembly 37 ...
Page 40: ......