Tips on how to place your Mark in the field.

Installation Guide  

For Short & Tall Crops  

Step 3. 

Attach Mark to Pole

Attach the vertical mount to the top of the pole. 
The knob on the mount should be pointed east if the 
spectrometer positioning over the crop permits it. Do 
not fully tighten the knob. 

For taller crops, secure 

the pole to the trellis post using band clamps; 

put one at the base and one at the top. Make sure 
the lenses on the bottom of the device are over the 
canopy, 

NOT

 the bare furrow. The device should be 

positioned at the suggested height from the Mark 
Height Placement Guide.

Step 4. 

Check Level and Orientation

Press and hold down the button for a few seconds 
until all lights blink blue twice; this is how the Mark 
will go into leveling mode.

The Mark knows when it is level, but needs your 
help getting there. If the device is not perfectly level, 
only two or three LEDs will illuminate. The LED 
that does not illuminate is the low side. Gently push 
the device away from the low side until that LED 
illuminates. A different LED may go dark. Repeat the 
process until all 4 LEDs are illuminated. Once you 
are successful, all four lights will be illuminated and 
you may quickly press the button to go to the next 
step. Devices need to be approximately level to 
ensure accurate readings.

Summary of Contents for MARK

Page 1: ...ARABLE MARK QUICK START GUIDE On your Mark get set go...

Page 2: ...network You can log into the Arable platform by going to app arable com If you do not know your organization name or customized organization URL please reach out to support arable com Evapotranspirati...

Page 3: ...2 Longwave Radiometer and Infrared Temperature Shortwave Radiometer and Spectrometer Air Temperature Humidity Pressure Charging Indicator Light Solar Cells LED Indicator Lights Battery Check and Set...

Page 4: ...g at a circular area below it with a diameter that is twice its mounted height If you are installing a freestanding pole it should be 12 in the ground canopy height recommended height above the canopy...

Page 5: ...ee Recommended Height Above Canopy row width 1 row width The most important consideration here is getting the full 70 angle of the infrared temperature sensor to hit the canopy To achieve this the Mar...

Page 6: ...cement Drive the pole firmly into the ground so that it is roughly level and will not slip in time Make sure to avoid any irrigation lines below the soil FOR TALL CROPS 4 AND ABOVE Step 1 Pole Placeme...

Page 7: ...may take 3 to 5 minutes Please stay with the device during this time When the initiation sequence is finished all four lights around the Arable logo will shine solid blue and blink in unison a few ti...

Page 8: ...ds Then wait one minute and try again by reconnecting the device to its mount If you redeploy and the light to the right of the Arable A logo is still red the Mark has failed to reach a server You may...

Page 9: ...height from the Mark Height Placement Guide Step 4 Check Level and Orientation Press and hold down the button for a few seconds until all lights blink blue twice this is how the Mark will go into lev...

Page 10: ...location It may take up to 2 hours for the devices to show in the app You can select the new locations from the list on the right side of the interface and give them a name or tags such as the variet...

Page 11: ...d can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interfe...

Page 12: ...Arable Labs Inc www arable com ArableLabs...

Reviews: