
HiQu Digital Concealed
installation instructions
Page 7
Installation instructions
90mm
4
4
5
m
m
2
7
0
m
m
350mm
2
6
5
m
m
70mm
To ensure safe operation and installation of this product, the processor MUST be
installed in one of the orientations shown.
1
This product must be installed by a competent person in accordance with the
relevant current Water Supply Regulations.
In addition to the guide below it is essential that the written instructions
overleaf are read and understood and that you have all the necessary
components (shown overleaf) before commencing installation.
!
The HiQu Digital shower system is supplied with universal fixings intended to
secure it to a suitable wall.
!
!
Isolation valves are supplied with the Digital
processor and must be fitted on both inlets
and the blended water outlet. All pipe work
should be run in 15mm pipe. All pipe work
should be supported. For externally pumped
gravity fed installations, 22mm pipe work
should be run as close to the processor as
possible before reducing down to 15mm.
2
The inlet supply centres are 48mm. The inlet supply centres deviate from
EN1111 and EN1287, but are deemed to be a special case.
Please note arrow on isolation valve to indicate direction of flow.
Compression fittings should not be used on the inlet and outlet spigots and
may affect the warranty if fitted.
!